42-413-33032

PRODUCING

POWELL 28

SCHLEICHER County · District 7 · OIL PROJECTS LLC · CARAWAY & SMITH (1600 SD.)

Permits

1

Max Depth

1,999 ft

First Permit

2023-11-27

Latest Activity

2023-11-27

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2026-01-05

Shut-In

Plugged

P-5 Org Status: Active

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (7) Elevation 2,208 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
COLEMAN JUNCTION - NORTHERN HALF (Coleman Junction)1,070 ft+1,138 ft
CANYON
CLEARFORK (Clear Fork)
ELLENBURGER
SAN ANGELO - 20 MILES NORTHWEST (San Angelo)
STRAWN
WOLFCAMP

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-413-32809 POWELL '28' · OIL PROJECTS, LLC
0.3 mi
COOK SAND 1,832'Palo Pinto 3,770'HARKEY 4,096'CAMAR, SW 4,308'Strawn 4,384'
42-413-31427 POWELL '28' · OIL PROJECTS, LLC
0.7 mi
Coleman Junction 1,380'Palo Pinto 3,780'HARKEY LIME 4,130'CAMAR 4,320'Strawn 4,378'
42-413-33006 THORNBURG 27 · BOAZ ENERGY II OPERATING, LLC
1.0 mi
Coleman Junction 1,366'Wolfcamp 2,038'Canyon 3,664'Strawn 3,904'San Angelo Clear Fork Ellenburger
42-413-32998 THORNBURG 27 · BOAZ ENERGY II OPERATING, LLC
1.0 mi
Coleman Junction 1,328'Wolfcamp 2,428'Canyon 3,710'Strawn 3,977'Ellenburger San Angelo Clear Fork
42-413-31460 HARZKE 29 · OIL PROJECTS, LLC
1.1 mi
Coleman Junction 1,400'Palo Pinto 3,833'HARKEY 4,112'CAMAR (UPPER) 4,330'CAMAR (LOWER) 4,368'Strawn 4,426'
42-413-31378 THORNBURG 27 · MCCABE, JOHN Q.
1.2 mi
Palo Pinto 3,748'Canyon 4,197'STRAW LIME 4,318'Strawn 4,318'
42-413-33003 THORNBURG 27 · BOAZ ENERGY II OPERATING, LLC
1.2 mi
Coleman Junction 1,378'Wolfcamp 2,027'Canyon 3,648'Strawn 3,906'Clear Fork Ellenburger San Angelo
42-413-31403 THORNBURG, M. · CHISOS OPERATING, INC.
1.4 mi
Palo Pinto 3,830'Canyon 3,920'Strawn 4,268'Strawn 4,414'

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (1)

IntervalType
1,641–1,646 ftPerforated

Casing (2)

SizeSet DepthCement
7.625"540 ft300 sx
4.5"1,896 ft175 sx

Permit History (1)

Applications (1)

#895449 A OIL PROJECTS, LLC
received 2023-11-21

Records & Logs

1 completion filing on record · 1 with log images at RRC.

W-2/G-1 2026-01-14 log on file
Completion packets + logs ↗ Wellbore filings ↗

Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.

Lat 30.884107
Lon -100.211079

Well Details

Well Number
51
Max Depth
1,999 ft
Drill Type
Vertical
County
SCHLEICHER
District
7
Completed
2026-01-05

Operator

Location
HOUSTON
P-5 Status
Active (filed 2025-10-09)
Cum Oil (all leases)
10,280 bbl
Cum Gas (all leases)
11,210 mcf
Activities
OPRS/O
Total Permits
17