42-415-34522

Final Completion

HAMMACK

SCURRY County · District 8 · VERADO ENERGY INC. · HERMLEIGH (STRAWN)

Permits

2

Max Depth

9,000 ft

First Permit

2009-03-24

Latest Activity

2019-06-26

Lifespan

10 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2009-07-31

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: VERADO ENERGY INC. ≠ Production: STRAWN PETROLEUM OPERATING, LLC (reported 2026-04)

Resolved via: productionSTRAWN PETROLEUM OPERATING, LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2009-07

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (7) Elevation 2,305 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
NOODLE CREEK4,520 ft-2,215 ft
LOWER CANYON (Canyon)6,480 ft-4,175 ft
STRAWN SAND (Strawn)6,890 ft-4,585 ft
ODOM7,137 ft-4,832 ft
CADDO 7,236 ft-4,931 ft
ELLENBERGER (Ellenburger)7,320 ft-5,015 ft
ELLENBURGER 7,320 ft-5,015 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-415-35340 DELTA · VERADO ENERGY, INC.
0.5 mi
Yates 480'San Andres 1,150'Clear Fork 3,300'Wolfcamp 3,860'Coleman Junction 4,200'Glorieta FULLER SAND Wichita-Albany Spraberry Wichita-Albany
42-415-35341 DELTA · VERADO ENERGY, INC.
0.5 mi
Yates 480'San Andres 1,150'Clear Fork 3,300'Coleman Junction 4,200'Wichita-Albany Wichita-Albany Glorieta Mississippian Ellenburger Spraberry
42-415-34578 HAMMACK · VERADO ENERGY, INC.
0.6 mi
NOODLE CREEK 4,530'Canyon 6,490'Strawn 6,920'
42-415-35426 DELTA EAST UNIT · VERADO ENERGY, INC.
0.7 mi
Yates 480'San Andres 1,150'Clear Fork 3,300'Wolfcamp 3,830'Coleman Junction 4,200'Wichita-Albany FULLER SAND Glorieta Wichita-Albany Spraberry
42-415-33525 WHITE · VERADO ENERGY, INC.
0.7 mi
TOP STAWN "B" SAND 6,998'Strawn 6,998'Strawn 6,998'ODOM 7,137'Caddo 7,236'Ellenburger 7,432'TOP ELLEN. 7,432'
42-415-35112 HAMMACK · VERADO ENERGY, INC.
0.7 mi
Yates 864'San Andres 1,910'Glorieta 2,533'Clear Fork 2,739'Wichita-Albany 3,230'Wichita-Albany 3,230'Coleman Junction 3,524'Wolfcamp 3,900'ODOM 7,137'FULLER SAND Spraberry
42-415-34651 HAMMACK · VERADO ENERGY, INC.
0.8 mi
NOODLE CREEK 4,515'Canyon 6,475'Strawn 6,835'ODOM 7,137'Caddo 7,236'
42-415-34883 STEPHENS · VERADO ENERGY, INC.
0.9 mi
NOODLE CREEK 4,350'NOODLE CREEK 4,530'Canyon 6,490'Strawn 6,920'

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (1)

IntervalType
6,974–7,010 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"1,574 ft800 sx
5.5"7,404 ft1,045 sx

Permit History (2)

Applications (2)

#854536 A VERADO ENERGY, INC.
received 2019-06-25
#679499 A FOUR C OIL & GAS CORP.
received 2009-03-16

Records & Logs

3 completion filings on record · 2 with log images at RRC.

W-2/G-1 2019-06-28 log on file
W-2/G-1 2009-08-04 log on file
W-2/G-1 2009-10-01

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 32.700860
Lon -100.724004

Well Details

Well Number
1
Max Depth
9,000 ft
Drill Type
Vertical
County
SCURRY
District
8
Completed
2009-07-31

Operator

Location
ALLEN
P-5 Status
Inactive (filed 2025-01-30)
Cum Oil (all leases)
4,196,945 bbl
Cum Gas (all leases)
241,389,842 mcf
Total Permits
193