42-415-35396

PRODUCING Horizontal

KATE 143 UNIT

SCURRY County · District 8 · STRAWN PETROLEUM OPERATING LLC · GARDEN CITY S. (WOLFCAMP)

Permits

2

Max Depth

14,000 ft

First Permit

2018-04-12

Latest Activity

2018-04-12

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2018-09-11

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: STRAWN PETROLEUM OPERATING LLC ≠ Permit: VERADO ENERGY, INC.

Resolved via: productionSTRAWN PETROLEUM OPERATING, LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2016-05

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (10) Elevation 2,394 ft (KB)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
YATES - HIGH FLUIDS AND/OR GAS F (Yates)550 ft+1,844 ft
SAN ANDRES - HIGH FLOWS, H2S, CO (San Andres)1,230 ft+1,164 ft
CLEARFORK (Clear Fork)3,650 ft-1,256 ft
WOLFCAMP 3,970 ft-1,576 ft
COLEMAN JUNCTION - POSSIBLE LOST (Coleman Junction)4,240 ft-1,846 ft
FULLER SAND
GLORIETA
SPRABERRY
WICHITA (Wichita-Albany)
WICHITA ALBANY - OVER PRESSURED (Wichita-Albany)

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-415-35206 WILLIAMS UNIT · VERADO ENERGY, INC.
0.2 mi
Yates 550'San Andres 1,230'Clear Fork 2,085'Wolfcamp 3,934'Coleman Junction 4,237'Cisco 6,823'Canyon 7,022'Strawn 7,096'Wichita-Albany Glorieta
42-415-35471 MONEY 92 · BROWNING OIL COMPANY, INC.
1.2 mi
Coleman Junction 4,085'Wolfcamp 7,099'Wichita-Albany Glorieta FULLER SAND Wichita-Albany Spraberry Clear Fork San Andres Yates
42-415-35422 ROMEO · VERADO ENERGY, INC.
1.3 mi
Yates 480'San Andres 1,150'Coleman Junction 4,300'Cisco 5,330'Canyon 5,940'Strawn 6,950'FULLER SAND Ellenburger Mississippian Caddo
42-415-35395 OSCAR · VERADO ENERGY, INC.
1.3 mi
Wolfcamp 3,920'Cisco 5,680'Canyon 6,250'Strawn 7,040'Mississippian FULLER SAND Spraberry Caddo Ellenburger Wichita-Albany
42-415-32915 HALL · VERADO ENERGY, INC.
1.4 mi
T/STRAWN A SAND 6,990'Strawn 6,990'Strawn 7,080'T/STRAWN B SAND 7,080'T/CADDO 7,340'Caddo 7,340'
42-415-35404 MAPACHE GRANDE 144 · THREE SPAN OIL & GAS, INC.
1.5 mi
San Andres 2,430'Glorieta 2,780'Clear Fork 2,860'Coleman Junction 3,050'Wolfcamp 5,110'Spraberry 5,140'Wolfcamp 6,035'Wichita-Albany Yates Wichita-Albany FULLER SAND Spraberry
42-415-32917 BECK · VERADO ENERGY, INC.
1.6 mi
T/BLACK SHALE 6,495'BLACK SHALE 6,495'T/STRAWN SD 7,080'Strawn 7,080'Ellenburger 7,480'T/ELLENBURGER 7,480'
42-415-35508 ECHOES 142 · BROWNING OIL COMPANY, INC.
1.6 mi
San Andres 4,000'Wolfcamp 7,125'Clear Fork Wichita-Albany Spraberry Wichita-Albany Yates Glorieta Coleman Junction FULLER SAND

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (1)

IntervalType
7,778–11,970 ftPerforated

Casing (3)

SizeSet DepthCement
13.375"1,700 ft1,585 sx
9.625"7,157 ft715 sx
5.5"12,075 ft1,345 sx

Permit History (2)

Applications (2)

#838639 A VERADO ENERGY, INC.
received 2018-06-29
#838639 A VERADO ENERGY, INC.
received 2018-04-09

Records & Logs

1 completion filing on record · 1 with log images at RRC.

W-2/G-1 2019-04-03 log on file

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 32.663978
Lon -100.731750

Well Details

Well Number
4H
Max Depth
14,000 ft
Drill Type
Horizontal
County
SCURRY
District
8
Completed
2018-09-11

Operator

Location
HOUSTON
P-5 Status
Active (filed 2025-11-10)
Cum Oil (all leases)
1,163,585 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
8