42-435-33201

Final Completion

WARD RIP N

SUTTON County · District 7 · SMITH PIPE OF ABILENE · SAWYER (CANYON)

Permits

1

Max Depth

7,800 ft

First Permit

1984-09-26

Latest Activity

1984-09-26

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-12-20

Shut-In

Plugged

1997-11-18

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: DREYFUS, LOUIS NATURAL GAS CORP (reported 1995-05)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: STATEX PETROLEUM INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1997-11

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (3) Elevation 2,201 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
BASE CRETACEOUS (Base Cretaceous (marker))1,330 ft+871 ft
TOP CANYON (Canyon)5,158 ft-2,957 ft
TOP CANYON SANDS (Canyon)5,810 ft-3,609 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (2)

IntervalType
5,879–5,983 ftPerforated
6,416–6,947 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"1,316 ft890 sx
4.5"7,100 ft1,155 sx

Permit History (1)

Applications (1)

#252807 A STATEX PETROLEUM INC.
received 1984-09-26

Records & Logs

2 completion filings on record.

W-2/G-1 1985-01-14
W-2/G-1 1984-12-31

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in SUTTON County.

Well Details

Well Number
51
Max Depth
7,800 ft
Drill Type
Vertical
County
SUTTON
District
7
Completed
1984-12-20

Operator

Location
ABILENE
P-5 Status
Inactive (filed 2014-08-29)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf