42-441-31829

Final Completion

GRAHAM

TAYLOR County · District 7 · NUEVE OPERATING CO. OF TEXAS · ULANDER (CROSS CUT)

Permits

1

Max Depth

5,800 ft

First Permit

1981-03-02

Latest Activity

1981-03-02

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-05-07

Shut-In

Plugged

1984-06-26

!

EWA / Permit operator mismatch

Scheduling: NUEVE OPERATING CO. OF TEXAS ≠ Permit: PENROC ENERGY

Resolved via: schedulingNUEVE OPERATING CO. OF TEXAS

Operator History

originally filed by PENROC ENERGY — asset transferred

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
4,420–4,425 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"100 ft260 sx
2.875"4,378 ft
4.5"5,785 ft50 sx

Permit History (1)

Applications (1)

#109923 A PENROC ENERGY
received 1981-03-02

Records & Logs

1 completion filing on record.

W-2/G-1 1981-07-02

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in TAYLOR County.

Well Details

Well Number
1
Max Depth
5,800 ft
Drill Type
Vertical
County
TAYLOR
District
7
Completed
1981-05-07

Operator

Location
ABILENE
P-5 Status
Inactive (filed 1985-06-21)
Total Permits
286