Permits
1
Max Depth
5,500 ft
First Permit
2012-08-11
Latest Activity
2012-08-11
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2004-08
Last Production
2026-07
Injection / Disposal
Permitted Volume
300 bbl/d
Max Pressure
2,500 psi
Injection Interval
5,200–5,550 ft
Injected (12mo)
12,013 bbl
Monthly injected volume (bbl, from H-10 filings through 2025-11-01)
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3) Elevation 3,486 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| RUSTLER | 2,514 ft | +972 ft |
| YATES | 3,234 ft | +252 ft |
| SAN ANDRES | 4,612 ft | -1,126 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 5,218–5,284 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 9.625" | 478 ft | 350 sx |
| 4.5" | 5,218 ft | 1,300 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 24
- Max Depth
- 5,500 ft
- Drill Type
- Vertical
- County
- TERRY
- District
- 8
- Operator
- TEXLAND PETROLEUM, L.P.
Operator
- Name
- TEXLAND PETRO, L.P
- Location
- FORT WORTH
- P-5 Status
- Active (filed 2025-10-15)
- Cum Oil (all leases)
- 51,657,978 bbl
- Cum Gas (all leases)
- 6,551,156 mcf
- Activities
- OPRS/G, OPRS/O
- Total Permits
- 677