42-475-00633
Unperfed Completion DirectionalMONROE (CHERRY CANYON)
WARD County · District 8 · HPPC INC. · SCOTT (CHERRY CANYON)
Permits
1
Max Depth
6,700 ft
First Permit
2016-04-26
Latest Activity
2016-04-26
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2016-05-01
Shut-In
—
Plugged
—
!
EWA / Production operator mismatch
Scheduling: HPPC INC. ≠ Production: TEKE PRODUCTION LLC (reported 2023-02)
Resolved via: scheduling → HPPC INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#815242 A HPPC, INC.
received 2016-04-25
Well Details
Operator
- Name
- HPPC, INC
- Location
- MIDLAND
- P-5 Status
- Y (filed 2023-01-14)
- Cum Oil (all leases)
- 115,616 bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 8