42-475-03532
Final CompletionEDWARDS JACK ET AL
WARD County · District 8 · CHEVRON U. S. A. INC. · JANELLE SE. (WADDELL)
Permits
2
Max Depth
8,550 ft
First Permit
1994-08-03
Latest Activity
2005-05-05
Lifespan
11 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
!
EWA / Production operator mismatch
Scheduling: CHEVRON U. S. A. INC. ≠ Production: PITTS ENERGY CO. (reported 2025-12)
Resolved via: production → PITTS ENERGY CO.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#600119 A CHEVRON U. S. A. INC.
received 2005-05-03
#426467 A CHEVRON U. S. A. INC.
received 1994-08-01
Well Details
- Well Number
- 1
- Max Depth
- 8,550 ft
- Drill Type
- Vertical
- County
- WARD
- District
- 8
- Operator
- CHEVRON U. S. A. INC.
Operator
- Name
- TEXACO E & P INC
- Location
- MIDLAND
- P-5 Status
- Y (filed 2025-11-04)
- Cum Oil (all leases)
- 622,347,311 bbl
- Cum Gas (all leases)
- 4,191,207,826 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
- Total Permits
- 9,226