42-475-34158
NO PRODUCTIONHALL-THORNTON UNIT
WARD County · District 8 · NESITOR WEST TEXAS LLC · RHODA WALKER (CANYON 5900)
Permits
1
Max Depth
6,900 ft
First Permit
1993-04-07
Latest Activity
1993-04-07
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
1996-05-23
Shut-In
—
Plugged
—
P-5 Org Status: Delinquent
EWA / Permit operator mismatch
Scheduling: NESITOR WEST TEXAS LLC ≠ Permit: PITTENCRIEFF AMERICA, INC.
Resolved via: scheduling → NESITOR WEST TEXAS LLC
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-05
Last Production
2026-07
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (5) Elevation 2,624 ft (KB)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| RUSTLER | 555 ft | +2,069 ft |
| BELL CANYON | 5,087 ft | -2,463 ft |
| CHERRY CANYON | 5,840 ft | -3,216 ft |
| MANZANITA | 6,098 ft | -3,474 ft |
| THORNTON SAND | 6,484 ft | -3,860 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (11)
| Interval | Type |
|---|---|
| 6,242–6,268 ft | Perforated |
| 6,242–6,326 ft | Perforated |
| 6,291–6,296 ft | Perforated |
| 6,322–6,326 ft | Perforated |
| 6,354–6,376 ft | Perforated |
| 6,354–6,465 ft | Perforated |
| 6,454–6,458 ft | Perforated |
| 6,460–6,465 ft | Perforated |
| 6,486–6,502 ft | Perforated |
| 6,486–6,512 ft | Perforated |
| 6,508–6,512 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 13.375" | 352 ft | 315 sx |
| 8.625" | 2,650 ft | 1,050 sx |
| 5.5" | 6,910 ft | 425 sx |
Permit History (1)
Applications (1)
Records & Logs
4 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 6,900 ft
- Drill Type
- Vertical
- County
- WARD
- District
- 8
- Operator
- NESITOR WEST TEXAS LLC
- Completed
- 1996-05-23
Operator
- Location
- FRISCO
- P-5 Status
- Delinquent (filed 2021-02-22)
- Cum Oil (all leases)
- 11,078 bbl
- Cum Gas (all leases)
- — mcf
- Activities
- OPRS/O