42-487-33237

PRODUCING

THIEME 22

WILBARGER County · District 9 · DRY FORK PRODUCTION CO. LLC · WAGGONER SHELF (ATOKA)

Permits

1

Max Depth

5,000 ft

First Permit

2021-11-29

Latest Activity

2021-11-29

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2022-02-22

Shut-In

Plugged

P-5 Org Status: X

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2022-02

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (10) Elevation 1,193 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
CANYON 3,255 ft-2,062 ft
PALO PINTO 3,722 ft-2,529 ft
ATOKA 4,864 ft-3,671 ft
CISCO
COLEMAN JUNCTION - CORROSIVE ZON (Coleman Junction)
DYSON SAND
KING
KMA
MILHAM SAND
STRAWN

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-487-33218 WAGGONER · DRY FORK PRODUCTION CO., LLC
0.2 mi
Gunsight 2,540'NOBLE LIME 2,700'Canyon 3,190'MILHAM SAND Palo Pinto Coleman Junction DYSON SAND KING KMA Caddo Cisco Strawn
42-487-33179 THIEME · DRY FORK PRODUCTION CO., LLC
0.2 mi
Cisco 3,210'Canyon 3,250'Caddo 4,560'Palo Pinto DYSON SAND KING MILHAM SAND KMA Coleman Junction Strawn
42-487-33185 WAGGONER · DRY FORK PRODUCTION CO., LLC
0.3 mi
Canyon 3,192'Strawn 4,122'Caddo 4,450'KMA Palo Pinto Coleman Junction DYSON SAND Cisco KING MILHAM SAND
42-487-33178 THIEME · DRY FORK PRODUCTION CO., LLC
0.5 mi
NOBLE LIME 2,895'MIDDLETON SAND 3,236'Canyon 3,250'RAINWATER (CONGL.) 4,864'DYSON SAND Coleman Junction Cisco Palo Pinto KING MILHAM SAND KMA
42-487-33208 GFELLER RAMSEY 22 · DRY FORK PRODUCTION CO., LLC
0.5 mi
DYSON SAND 1,800'Cisco 2,510'Coleman Junction KING MILHAM SAND KMA Palo Pinto Caddo Strawn Canyon
42-487-32243 WAGGONER-EPCO · WAGGONER, W. T., ESTATE
0.8 mi
Ellenburger 4,974'Ellenburger 4,974'MILHAM SAND KMA Palo Pinto Coleman Junction Caddo Cisco Strawn DYSON SAND Canyon KING
42-487-33232 WAGGONER 'PP' · DRY FORK PRODUCTION CO., LLC
1.0 mi
NOBLE LIME 3,104'Canyon 3,490'Caddo 4,510'Atoka 4,890'
42-487-33126 BYARS GFELLER UNIT · DRY FORK PRODUCTION CO., LLC
1.0 mi
MILHAM SAND 2,440'NOBLE LIME 2,980'Canyon 3,445'Canyon 3,445'KMA Palo Pinto KING Cisco Coleman Junction DYSON SAND

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (1)

IntervalType
4,864–4,874 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"124 ft90 sx
5.5"5,100 ft230 sx

Permit History (1)

Applications (1)

#874681 A DRY FORK PRODUCTION CO., LLC
received 2021-11-18

Records & Logs

1 completion filing on record · 1 with log images at RRC.

W-2/G-1 2022-12-08 log on file

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 34.053403
Lon -99.142949

Well Details

Well Number
1
Max Depth
5,000 ft
Drill Type
Vertical
County
WILBARGER
District
9
Completed
2022-02-22

Operator

Location
WICHITA FAL, LS
P-5 Status
X (filed 2026-05-01)
Cum Oil (all leases)
1,056,757 bbl
Cum Gas (all leases)
1,855,922 mcf
Activities
OPRS/O
Total Permits
206