42-501-37043

Final Completion Horizontal

HORSE HEAD WEST

YOAKUM County · District 8 · VERDUGO-PABLO ENERGY LLC · SABLE (SAN ANDRES)

RRC Lookup

Permits

2

Max Depth

6,500 ft

First Permit

2018-09-19

Latest Activity

2018-09-19

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2019-01-21

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: VERDUGO-PABLO ENERGY LLC ≠ Production: WHITE STRIDE LLC (reported 2025-11)

Resolved via: productionWHITE STRIDE LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2019-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#844819 A VERDUGO-PABLO ENERGY, LLC
received 2020-03-16
#844819 A VERDUGO-PABLO ENERGY, LLC
received 2018-09-19
Lat 33.226761
Lon -102.765144

Well Details

Well Number
1H
Max Depth
6,500 ft
Drill Type
Horizontal
County
YOAKUM
District
8
Completed
2019-01-21

Operator

Location
AMARILLO
P-5 Status
Y (filed 2026-03-04)
Cum Oil (all leases)
314,168 bbl
Cum Gas (all leases)
— mcf
Total Permits
22

External Links

Live © 2026 Petrora