42-501-37203
Final Completion HorizontalRR-GOOGINS 249-W POOLED UNIT
YOAKUM County · District 8 · E R OPERATING COMPANY · SABLE (SAN ANDRES)
Permits
1
Max Depth
5,400 ft
First Permit
2019-10-08
Latest Activity
2019-10-08
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2020-01-28
Shut-In
—
Plugged
—
!
EWA / Production operator mismatch
Scheduling: E R OPERATING COMPANY ≠ Production: ROOSEVELT RESOURCES LP (reported 2025-12)
Resolved via: production → ROOSEVELT RESOURCES LP
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2019-06
Last Production
2026-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#857509 A E R OPERATING COMPANY
received 2019-09-27
Lat 33.292559
Lon -102.866587
Well Details
- Well Number
- 2493H
- Max Depth
- 5,400 ft
- Drill Type
- Horizontal
- County
- YOAKUM
- District
- 8
- Operator
- E R OPERATING COMPANY
- Completed
- 2020-01-28
Operator
- Name
- E R OPER CO
- Location
- DALLAS
- P-5 Status
- Y (filed 2025-11-04)
- Cum Oil (all leases)
- 1,064,023 bbl
- Cum Gas (all leases)
- 15,774,360 mcf
- Total Permits
- 65