42-503-42529

PRODUCING

INGLISH UNIT

YOUNG County · District 9 · GANNETT OPERATING LLC · CARR (CONGLOMERATE)

Permits

3

Max Depth

5,000 ft

First Permit

2022-06-14

Latest Activity

2022-06-14

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2022-12-08

Shut-In

Plugged

P-5 Org Status: X

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2022-12

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (10) Elevation 1,137 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
PALO PINTO 1,398 ft-261 ft
CADDO 3,790 ft-2,653 ft
MISSISSIPPIAN - POSSIBLE H2S (Mississippian)4,485 ft-3,348 ft
BRYSON
BUTTRAM
CANYON
CISCO
GUNSIGHT LIME (Gunsight)
HERRON CITY
STRAWN

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-503-42565 LUPTON UNIT · GANNETT OPERATING LLC
1.0 mi
Palo Pinto 1,404'Caddo 3,853'Strawn Bryson Canyon Atoka HERRON CITY Gunsight Cisco BUTTRAM
42-503-42380 ALDRIDGE · GANNETT OPERATING LLC
2.2 mi
Palo Pinto 1,372'Caddo 3,753'Cisco Atoka BUTTRAM HERRON CITY Gunsight Strawn Bryson Canyon
42-503-31700 CLARK UNIT · PHOENIX PETROCORP, INC.
2.4 mi
MCLESTER 3,812'MCLESTER 3,827'UPPER MCLESTER 3,878'MCLESTER 3,878'LOWER MCLESTER 3,897'Caddo 3,978'LOWER MCLESTER Caddo UPPER MCLESTER
42-503-42448 TIMMONS CREEK · GANNETT OPERATING LLC
2.5 mi
CAPPS LIME 1,924'Caddo 3,769'HERRON CITY Palo Pinto Gunsight Strawn Bryson Canyon BUTTRAM Cisco
42-503-42505 HUGHES R · RUTHSON ENERGY, INC.
2.8 mi
Cisco 940'Gunsight 1,010'Bryson 3,250'Palo Pinto Strawn Canyon Caddo Atoka BUTTRAM HERRON CITY
42-503-42484 HUGHES · RUTHSON ENERGY, INC.
2.9 mi
Cisco 940'Gunsight 1,010'Strawn 1,520'Canyon 1,810'Bryson 3,250'Caddo 5,308'Atoka BUTTRAM HERRON CITY Palo Pinto
42-503-42492 HUGHES · RUTHSON ENERGY, INC.
3.0 mi
Cisco 940'Gunsight 1,010'Bryson 3,250'Atoka BUTTRAM HERRON CITY Palo Pinto Strawn Canyon Caddo
42-503-42516 HUGHES R · RUTHSON ENERGY, INC.
3.2 mi
Cisco 940'Gunsight 1,010'Bryson 3,250'Palo Pinto Atoka Canyon Caddo Strawn BUTTRAM HERRON CITY

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (1)

IntervalType
4,198–4,231 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"256 ft180 sx
4.5"4,490 ft150 sx

Permit History (3)

Applications (3)

#880900 A GANNETT OPERATING LLC
received 2023-10-06
#880900 A GANNETT OPERATING LLC
received 2022-09-20
#880900 A GANNETT OPERATING LLC
received 2022-06-06

Records & Logs

1 completion filing on record · 1 with log images at RRC.

W-2/G-1 2023-08-22 log on file

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 33.090634
Lon -98.697165

Well Details

Well Number
1
Max Depth
5,000 ft
Drill Type
Vertical
County
YOUNG
District
9
Completed
2022-12-08

Operator

Location
GRAHAM
P-5 Status
X (filed 2026-05-29)
Cum Oil (all leases)
220,991 bbl
Cum Gas (all leases)
1,431,966 mcf
Activities
OPRS/G, OPRS/O
Total Permits
21