42-399-35458

MOCHA UNIT

RUNNELS County · District 7 · PONY EXPRESS CORPORATE TRUST

Permits

2

Max Depth

4,999 ft

First Permit

2014-11-05

Latest Activity

2025-07-10

Lifespan

11 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2015-01

Last Production

2026-07

Injection / Disposal

H-1 Injection Inactive UIC #000127332 permitted 2025-08-18

Permitted Volume

500 bbl/d

Max Pressure

2,150 psi

Injection Interval

4,320–4,640 ft

Injected (12mo)

Monthly injected volume (bbl, from H-10 filings through 2026-03-01)

Seismicity: no M2+ earthquakes recorded within 10 km in the last 24 months · TexNet catalog

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (10) Elevation 1,837 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
COLEMAN JUNCTION - POSSIBLE WATE (Coleman Junction)1,620 ft+217 ft
KING2,755 ft-918 ft
CISCO 3,410 ft-1,573 ft
PALO PINTO 3,850 ft-2,013 ft
GOEN4,318 ft-2,481 ft
ODOM4,710 ft-2,873 ft
CADDO 4,760 ft-2,923 ft
MISSISSIPIAN4,855 ft-3,018 ft
CANYON
PROBLEM ZONE - 5 MILE RADIUS ARO

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-399-35521 EVANS · WINDOW OPERATING CO., THE
0.5 mi
Coleman Junction 1,840'Canyon 3,232'CAPPS LIME 4,104'Strawn 4,584'Cisco CAMBRIAN PROBLEM ZONE - 5 MILE RADIUS ARO KING
42-399-35628 EVANS · PONY EXPRESS CORPORATE TRUST
0.5 mi
Coleman Junction 1,600'Canyon 3,357'GOEN LIME 4,287'PROBLEM ZONE - 5 MILE RADIUS ARO KING CAMBRIAN Cisco Strawn
42-399-35457 DAPHNE UNIT · LAKEWOOD OPERATING, LTD.
1.2 mi
Coleman Junction 1,635'KING 2,822'Cisco 3,495'Palo Pinto 3,890'Palo Pinto 3,890'GOEN 4,350'Mississippian 4,900'Canyon CAMBRIAN Strawn PROBLEM ZONE - 5 MILE RADIUS ARO
42-399-35629 RISE BULLSEYE · HARVEST PETROLEUM INC.
4.0 mi
Coleman Junction 1,220'Palo Pinto 3,759'CROSS CUT 3,814'Cisco Strawn Canyon KING PROBLEM ZONE - 5 MILE RADIUS ARO CAMBRIAN
42-399-35497 BILLIMEIR · EAGLE PRODUCTION, INC.
4.1 mi
Coleman Junction 1,800'Canyon 3,400'CAPPS LIMESTONE 3,956'CAMBRIAN PROBLEM ZONE - 5 MILE RADIUS ARO Cisco Strawn KING
42-399-35550 RLR ODOM · ENRICH OIL CORPORATION
6.6 mi
Coleman Junction 1,480'PROBLEM ZONE - 5 MILE RADIUS ARO 1,480'Cisco 2,805'KING 3,066'Canyon 3,655'Strawn 3,990'ODOM LIME 4,525'CAMBRIAN
42-399-35576 BELK ''A'' UNIT · GOLDEN OIL AND RANCH, LLC
6.8 mi
Coleman Junction 1,700'KING 2,970'Cisco 3,395'Canyon 3,520'Strawn 4,248'PROBLEM ZONE - 5 MILE RADIUS ARO CAMBRIAN
42-399-35571 BELK 'A' UNIT · GOLDEN OIL AND RANCH, LLC
6.9 mi
Coleman Junction 1,706'KING 2,970'Cisco 3,395'Canyon 3,520'Strawn 4,248'CAMBRIAN PROBLEM ZONE - 5 MILE RADIUS ARO

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (1)

IntervalType
3,855–3,867 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"185 ft110 sx
5.5"4,942 ft310 sx

Permit History (2)

Applications (2)

#909136 A PONY EXPRESS CORPORATE TRUST
received 2025-07-09
#799739 A LAKEWOOD OPERATING, LTD.
received 2014-11-05

Records & Logs

1 completion filing on record · 1 with log images at RRC.

W-2/G-1 2015-05-29 log on file

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 31.849911
Lon -100.088829

Well Details

Well Number
1
Max Depth
4,999 ft
Drill Type
Vertical
County
RUNNELS
District
7

Operator

Location
ALEDO
P-5 Status
X (filed 2026-04-20)
Cum Oil (all leases)
16,295 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/G, OPRS/O
Total Permits
3