42-399-35550

PRODUCING

RLR ODOM

RUNNELS County · District 7 · HARDROCK RESOURCES INC. · MOTLEY NORTH (ODOM LIME)

Permits

1

Max Depth

5,000 ft

First Permit

2018-09-05

Latest Activity

2018-09-05

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2019-02-22

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: HARDROCK RESOURCES INC. ≠ Permit: ENRICH OIL CORPORATION

Resolved via: productionHARDROCK RESOURCES INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2018-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (8) Elevation 1,685 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
COLEMAN JUNCTION - POSSIBLE WATE (Coleman Junction)1,480 ft+205 ft
PROBLEM ZONE - 5 MILE RADIUS ARO1,480 ft+205 ft
CISCO 2,805 ft-1,120 ft
KING3,066 ft-1,381 ft
CANYON 3,655 ft-1,970 ft
STRAWN 3,990 ft-2,305 ft
ODOM LIME4,525 ft-2,840 ft
CAMBRIAN

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-399-35535 RLR ODOM · ENRICH OIL CORPORATION
0.6 mi
Coleman Junction 1,400'PROBLEM ZONE - 5 MILE RADIUS ARO 1,400'KING 2,760'Cisco 3,105'Canyon 3,664'Strawn 4,170'CAMBRIAN
42-399-35629 RISE BULLSEYE · HARVEST PETROLEUM INC.
2.6 mi
Coleman Junction 1,220'Palo Pinto 3,759'CROSS CUT 3,814'CAMBRIAN PROBLEM ZONE - 5 MILE RADIUS ARO KING Cisco Strawn Canyon
42-399-35497 BILLIMEIR · EAGLE PRODUCTION, INC.
6.2 mi
Coleman Junction 1,800'Canyon 3,400'CAPPS LIMESTONE 3,956'PROBLEM ZONE - 5 MILE RADIUS ARO KING CAMBRIAN Cisco Strawn
42-399-35521 EVANS · WINDOW OPERATING CO., THE
6.3 mi
Coleman Junction 1,840'Canyon 3,232'CAPPS LIME 4,104'Strawn 4,584'CAMBRIAN KING Cisco PROBLEM ZONE - 5 MILE RADIUS ARO
42-399-35457 DAPHNE UNIT · LAKEWOOD OPERATING, LTD.
6.4 mi
Coleman Junction 1,635'KING 2,822'Cisco 3,495'Palo Pinto 3,890'Palo Pinto 3,890'GOEN 4,350'Mississippian 4,900'CAMBRIAN PROBLEM ZONE - 5 MILE RADIUS ARO Strawn Canyon
42-399-35458 MOCHA UNIT · PONY EXPRESS CORPORATE TRUST
6.6 mi
Coleman Junction 1,620'KING 2,755'Cisco 3,410'Palo Pinto 3,850'GOEN 4,318'ODOM 4,710'Caddo 4,760'MISSISSIPIAN 4,855'PROBLEM ZONE - 5 MILE RADIUS ARO Canyon
42-399-35628 EVANS · PONY EXPRESS CORPORATE TRUST
7.0 mi
Coleman Junction 1,600'Canyon 3,357'GOEN LIME 4,287'Cisco PROBLEM ZONE - 5 MILE RADIUS ARO KING CAMBRIAN Strawn
42-399-35479 ROYALE MOSELY · SD ROYALE ENERGY, INC.
7.4 mi
Coleman Junction 765'PROBLEM ZONE - 5 MILE RADIUS ARO 1,000'Palo Pinto 3,380'Canyon 3,380'Strawn 3,650'CAPPS 3,650'CAMBRIAN 4,190'KING Cisco

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (1)

IntervalType
4,525–4,531 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"166 ft120 sx
5.5"4,628 ft300 sx

Permit History (1)

Applications (1)

#844242 A ENRICH OIL CORPORATION
received 2018-08-31

Records & Logs

1 completion filing on record.

W-2/G-1 2019-04-24

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 31.755111
Lon -100.083250

Well Details

Well Number
2
Max Depth
5,000 ft
Drill Type
Vertical
County
RUNNELS
District
7
Completed
2019-02-22

Operator

Location
WINTERS
P-5 Status
Active (filed 2026-02-24)
Cum Oil (all leases)
171,976 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
4