42-399-35535

PRODUCING

RLR ODOM

RUNNELS County · District 7 · HARDROCK RESOURCES INC. · MOTLEY NORTH (ODOM LIME)

Permits

1

Max Depth

5,100 ft

First Permit

2017-10-11

Latest Activity

2017-10-11

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2018-01-01

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: HARDROCK RESOURCES INC. ≠ Permit: ENRICH OIL CORPORATION

Resolved via: productionHARDROCK RESOURCES INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2018-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (7) Elevation 1,695 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
COLEMAN JUNCTION - POSSIBLE WATE (Coleman Junction)1,400 ft+295 ft
PROBLEM ZONE - 5 MILE RADIUS ARO1,400 ft+295 ft
KING2,760 ft-1,065 ft
CISCO 3,105 ft-1,410 ft
CANYON 3,664 ft-1,969 ft
STRAWN 4,170 ft-2,475 ft
CAMBRIAN

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-399-35550 RLR ODOM · ENRICH OIL CORPORATION
0.6 mi
Coleman Junction 1,480'PROBLEM ZONE - 5 MILE RADIUS ARO 1,480'Cisco 2,805'KING 3,066'Canyon 3,655'Strawn 3,990'ODOM LIME 4,525'CAMBRIAN
42-399-35629 RISE BULLSEYE · HARVEST PETROLEUM INC.
3.2 mi
Coleman Junction 1,220'Palo Pinto 3,759'CROSS CUT 3,814'CAMBRIAN PROBLEM ZONE - 5 MILE RADIUS ARO KING Cisco Strawn Canyon
42-399-35497 BILLIMEIR · EAGLE PRODUCTION, INC.
6.7 mi
Coleman Junction 1,800'Canyon 3,400'CAPPS LIMESTONE 3,956'KING PROBLEM ZONE - 5 MILE RADIUS ARO CAMBRIAN Cisco Strawn
42-399-35457 DAPHNE UNIT · LAKEWOOD OPERATING, LTD.
6.9 mi
Coleman Junction 1,635'KING 2,822'Cisco 3,495'Palo Pinto 3,890'Palo Pinto 3,890'GOEN 4,350'Mississippian 4,900'CAMBRIAN PROBLEM ZONE - 5 MILE RADIUS ARO Strawn Canyon
42-399-35521 EVANS · WINDOW OPERATING CO., THE
6.9 mi
Coleman Junction 1,840'Canyon 3,232'CAPPS LIME 4,104'Strawn 4,584'CAMBRIAN PROBLEM ZONE - 5 MILE RADIUS ARO Cisco KING
42-399-35458 MOCHA UNIT · PONY EXPRESS CORPORATE TRUST
7.1 mi
Coleman Junction 1,620'KING 2,755'Cisco 3,410'Palo Pinto 3,850'GOEN 4,318'ODOM 4,710'Caddo 4,760'MISSISSIPIAN 4,855'Canyon PROBLEM ZONE - 5 MILE RADIUS ARO
42-399-35628 EVANS · PONY EXPRESS CORPORATE TRUST
7.5 mi
Coleman Junction 1,600'Canyon 3,357'GOEN LIME 4,287'Cisco Strawn PROBLEM ZONE - 5 MILE RADIUS ARO KING CAMBRIAN
42-399-35479 ROYALE MOSELY · SD ROYALE ENERGY, INC.
7.7 mi
Coleman Junction 765'PROBLEM ZONE - 5 MILE RADIUS ARO 1,000'Palo Pinto 3,380'Canyon 3,380'Strawn 3,650'CAPPS 3,650'CAMBRIAN 4,190'KING Cisco

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (1)

IntervalType
4,542–4,548 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"180 ft120 sx
5.5"4,626 ft300 sx

Permit History (1)

Applications (1)

#831751 A ENRICH OIL CORPORATION
received 2017-10-09

Records & Logs

1 completion filing on record · 1 with log images at RRC.

W-2/G-1 2018-01-02 log on file

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 31.747118
Lon -100.086325

Well Details

Well Number
1
Max Depth
5,100 ft
Drill Type
Vertical
County
RUNNELS
District
7
Completed
2018-01-01

Operator

Location
WINTERS
P-5 Status
Active (filed 2026-02-24)
Cum Oil (all leases)
171,976 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
4