42-475-31958

Final Completion

CAROLINE H

WARD County · District 8 · HISSOM DRILLING CO. · QUITO WEST (CHERRY CANYON)

RRC Lookup

Permits

1

Max Depth

6,700 ft

First Permit

1979-10-04

Latest Activity

1979-10-04

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-11-21

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: HISSOM DRILLING CO. ≠ Production: SEABOARD OPERATING CO. (reported 2022-11)

Resolved via: schedulingHISSOM DRILLING CO.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#59713 A HISSOM DRILLING CO.
received 1979-10-04

Well Details

Well Number
1A
Max Depth
6,700 ft
Drill Type
Vertical
County
WARD
District
8
Completed
1979-11-21

Operator

Location
MIDLAND
P-5 Status
Y (filed 1989-04-14)
Total Permits
11

External Links

Live © 2026 Petrora