42-487-32586

Final Completion

LANE

WILBARGER County · District 9 · DRY FORK PRODUCTION CO. LLC · MAIN

Permits

2

Max Depth

4,200 ft

First Permit

2006-03-13

Latest Activity

2017-08-31

Lifespan

11 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2006-04-10

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: DRY FORK PRODUCTION CO. LLC ≠ Production: JM WELL SERVICE, INC. (reported 2026-04)

Resolved via: productionJM WELL SERVICE, INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2006-04

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (4) Elevation 1,261 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
GUNSIGHT LIME (Gunsight)2,600 ft-1,339 ft
GUNSITE LIME2,600 ft-1,339 ft
CANYON SAND (Canyon)3,086 ft-1,825 ft
CANYON LIME (Canyon)3,170 ft-1,909 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-487-33148 WAGGONER L · DRY FORK PRODUCTION CO., LLC
1.5 mi
MILHAM SAND 2,670'Cisco 2,921'Canyon 3,193'Palo Pinto Coleman Junction Caddo Strawn DYSON SAND KING KMA
42-487-33167 WAGGONER L · DRY FORK PRODUCTION CO., LLC
1.7 mi
Gunsight 2,640'CASTLEBURY 2,710'NOBLE LIME 2,766'MILHAM LIME 2,800'SLOAN SAND 2,850'MILHAM SAND Coleman Junction Cisco DYSON SAND KING
42-487-33187 WAGGONER L · DRY FORK PRODUCTION CO., LLC
1.8 mi
DYSON SAND 2,085'MILHAM SAND 2,850'KMA Palo Pinto Caddo Cisco Strawn Canyon KING Coleman Junction
42-487-33207 WAGGONER L · DRY FORK PRODUCTION CO., LLC
1.9 mi
CASTLBURY SAND 2,637'DYSON SAND KING MILHAM SAND KMA Palo Pinto Coleman Junction Cisco Strawn Canyon
42-487-33248 STEPHENS -B- · DOUBLE E OIL & GAS, L. P.
1.9 mi
MILHAM SAND 1,948'Canyon 2,361'Palo Pinto Coleman Junction Caddo Cisco KING Strawn DYSON SAND KMA
42-487-33161 WALKER SMITH · DRY FORK PRODUCTION CO., LLC
2.0 mi
Coleman Junction 800'KING 1,570'Gunsight 2,250'KMA Palo Pinto MILHAM SAND Canyon DYSON SAND Cisco Strawn
42-487-33235 HUMBLE-STEPHENS · DOUBLE E OIL & GAS, L. P.
2.1 mi
MILHAM SAND 2,000'Canyon 2,356'DYSON SAND KING KMA Palo Pinto Coleman Junction Caddo Cisco Strawn
42-487-33249 HUMBLE-STEPHENS · DOUBLE E OIL & GAS, L. P.
2.3 mi
Cisco 1,259'MILHAM SAND 2,059'Canyon 2,358'Palo Pinto DYSON SAND Caddo Strawn Coleman Junction KING KMA

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (2)

IntervalType
3,086–3,090 ftPerforated
3,172–3,192 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"119 ft75 sx
8.625"119 ft75 sx
4.5"3,368 ft200 sx

Permit History (2)

Applications (2)

#830294 A DRY FORK PRODUCTION CO., LLC
received 2017-08-24
#615724 A DRY FORK PRODUCTION CO., LLC
received 2006-03-13

Records & Logs

4 completion filings on record · 1 with log images at RRC.

W-2/G-1 2017-09-06
W-2/G-1 2014-07-02
W-2/G-1 2006-04-18 log on file
W-2/G-1 2006-05-17

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 34.059356
Lon -99.260885

Well Details

Well Number
1
Max Depth
4,200 ft
Drill Type
Vertical
County
WILBARGER
District
9
Completed
2006-04-10

Operator

Location
WICHITA FAL, LS
P-5 Status
X (filed 2026-05-01)
Cum Oil (all leases)
1,056,757 bbl
Cum Gas (all leases)
1,855,922 mcf
Activities
OPRS/O
Total Permits
206