42-487-33207

Final Completion

WAGGONER L

WILBARGER County · District 9 · DRY FORK PRODUCTION CO. LLC · W. C. (CASTLEBURY)

Permits

1

Max Depth

3,000 ft

First Permit

2020-06-10

Latest Activity

2020-06-10

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2020-09-09

Shut-In

Plugged

2021-07-06

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2020-09

Last Production

2021-12

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (10) Elevation 1,222 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
CASTLBURY SAND2,637 ft-1,415 ft
CANYON
CISCO
COLEMAN JUNCTION - CORROSIVE ZON (Coleman Junction)
DYSON SAND
KING
KMA
MILHAM SAND
PALO PINTO
STRAWN

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-487-33187 WAGGONER L · DRY FORK PRODUCTION CO., LLC
0.1 mi
DYSON SAND 2,085'MILHAM SAND 2,850'Palo Pinto Caddo Cisco KING KMA Strawn Canyon Coleman Junction
42-487-33167 WAGGONER L · DRY FORK PRODUCTION CO., LLC
0.1 mi
Gunsight 2,640'CASTLEBURY 2,710'NOBLE LIME 2,766'MILHAM LIME 2,800'SLOAN SAND 2,850'KING MILHAM SAND Cisco Coleman Junction DYSON SAND
42-487-33148 WAGGONER L · DRY FORK PRODUCTION CO., LLC
0.4 mi
MILHAM SAND 2,670'Cisco 2,921'Canyon 3,193'DYSON SAND KING KMA Palo Pinto Coleman Junction Caddo Strawn
42-487-32125 WALKER-SMITH "A" · WAGGONER, W. T., ESTATE
1.8 mi
Coleman Junction 1,020'KING 1,610'Canyon 3,780'KMA Palo Pinto MILHAM SAND Caddo Cisco Strawn DYSON SAND
42-487-32586 LANE · DRY FORK PRODUCTION CO., LLC
1.9 mi
GUNSITE LIME 2,600'Gunsight 2,600'Canyon 3,086'Canyon 3,170'
42-487-33161 WALKER SMITH · DRY FORK PRODUCTION CO., LLC
1.9 mi
Coleman Junction 800'KING 1,570'Gunsight 2,250'KMA MILHAM SAND Palo Pinto DYSON SAND Cisco Strawn Canyon
42-487-33137 WAGGONER B · TRIO CONSULTING & MANAGEMENT,LLC
2.9 mi
DYSON LIME 1,785'DYSON SAND 1,793'BRECKENRIDGE LIME 1,839'MEGARGLE SAND 1,900'Gunsight 1,998'NOBLE LIME 2,054'NOBLE SAND 2,087'Coleman Junction KING Cisco
42-487-33166 WAGGONER B · DRY FORK PRODUCTION CO., LLC
2.9 mi
Permian (undifferentiated) 405'MEGARGEL LIME 1,939'NOBLE LIME 2,060'NOBLE SAND 2,099'KING MILHAM SAND DYSON SAND Coleman Junction Canyon Cisco

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (1)

IntervalType
2,637–2,639 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"136 ft105 sx
5.5"3,023 ft265 sx

Permit History (1)

Applications (1)

#863684 A DRY FORK PRODUCTION CO., LLC
received 2020-05-21

Records & Logs

1 completion filing on record · 1 with log images at RRC.

W-2/G-1 2021-05-11 log on file

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 34.058037
Lon -99.228531

Well Details

Well Number
5
Max Depth
3,000 ft
Drill Type
Vertical
County
WILBARGER
District
9
Completed
2020-09-09

Operator

Location
WICHITA FAL, LS
P-5 Status
X (filed 2026-05-01)
Cum Oil (all leases)
1,056,757 bbl
Cum Gas (all leases)
1,855,922 mcf
Activities
OPRS/O
Total Permits
206