42-475-36934
Final Completion HorizontalSEALY & SMITH FOUNDATION C
WARD County · District 8 · ELAND ENERGY INC. · F. A. HOGG (PENN DETRITAL)
Permits
2
Max Depth
9,100 ft
First Permit
2014-12-03
Latest Activity
2019-09-06
Lifespan
5 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2015-11-17
Shut-In
—
Plugged
—
!
EWA / Production operator mismatch
Scheduling: ELAND ENERGY INC. ≠ Production: APACHE CORPORATION (reported 2015-11)
Resolved via: scheduling → ELAND ENERGY INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2015-08
Last Production
2026-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#856599 A ELAND ENERGY, INC.
received 2019-08-27
#799593 A APACHE CORPORATION
received 2014-11-04
Lat 31.650980
Lon -102.969047
Well Details
- Well Number
- 100H
- Max Depth
- 9,100 ft
- Drill Type
- Horizontal
- County
- WARD
- District
- 8
- Operator
- ELAND ENERGY INC.
- Completed
- 2015-11-17
Operator
- Name
- ELAND ENGY, INC
- Location
- DALLAS
- P-5 Status
- Y (filed 2021-12-10)
- Cum Oil (all leases)
- 2,811,241 bbl
- Cum Gas (all leases)
- 24,710,183 mcf
- Total Permits
- 55