GUIDES · TEXAS · REFERENCE

How current the data is

When each Railroad Commission source updates, how long each one lags the real world, and the rules Petrora follows so that lag is never hidden.

UPDATED OCT 29, 2026

Public oil and gas data is never live. Each source has its own filing deadline, processing time, and publication schedule, and the gap between what happened and what is visible ranges from a day to more than a year. Knowing the lag for each source is the difference between reading the data correctly and reading it wrong.

Source by source

SourceWhat it carriesPetrora loadsTypical lag
Drilling permits (daily files)New and amended permitsDailyIssued permits appear one to two days after issuance, longer over weekends
Wellbore (EWA) fileCurrent operator, well type, status datesWeeklyDays to a few weeks behind transfers and status changes
P-5 organization reportOperator registry and statusWeeklyDays
Wellbore records (dbf900)Completions, tops, casing, perforationsWeeklyFiled after completion; weeks to months after the work
Production (PDQ)Lease oil and gas by monthMonthlyThe last two to three months are incomplete and revised later
UIC permitsDisposal and injection permitsMonthlyWeeks
H-10 injection volumesMonthly injected volumesMonthlyAbout thirteen months
TexNet injection reportingDaily volumes in Permian response areasDailyAbout five days; Permian only
EarthquakesLocated eventsDailyHours to a day

Permits: issued date versus first seen

The RRC's daily permit files publish permits a day or two after they are issued, and the gap widens around weekends and holidays. Petrora records when each permit first appeared in its own database and uses that, rather than the issued date, to order recent permits and to decide what is new. A permit issued on a Friday and published the following Tuesday shows a Friday issue date and a Tuesday first-seen date. Both are shown.

Production: reported through

Production for a given month becomes visible over the following two or three monthly dumps as operators file and the RRC processes the reports. The most recent month in any dump is always short. Petrora labels production with the month it is reported through and does not present the latest partial month as if it were complete. Cumulative figures use everything reported to date and will rise slightly in later months for the same period.

The rules Petrora follows

  • No estimates shown as facts. No nowcasts, no extrapolation of partial months, no allocation of lease volumes to wells.
  • Lag is labeled. Figures from lagging sources carry the period they are reported through.
  • Fresh sources lead. Where a daily source exists, such as TexNet injection reporting, it is shown ahead of the annual one.
  • Counts are as of load time. Headline counts on the data page are refreshed hourly from the database and dated.

The one deliberate approximation on the site is the count of monthly production records on the data page, which uses the database's own row estimate because the exact count is too slow to serve on every request. It is marked with a tilde.