LEASES · G-2-295448 · GAS · DISTRICT 02
Terry-Pridgen Unit
No volume since Oct 2023Kaler Energy Corp. · Jackson County · Witte (LF-123) field
Terry-Pridgen Unit is an RRC gas lease (G-2-295448) in Jackson County operated by Kaler Energy Corp., with one well completed on it.
It has reported 106K mcf of gas since July 2022, last reporting volume in October 2023 (statewide data runs through April 2026).
The last 12 reported months total 103K mcf of gas.
- 106K
- mcf gas, all reported
- 0
- bbl condensate and oil
- 103K
- mcf gas, last 12 reported
- —
- vs the 12 before
- 1
- wells completed on it
- —
- peak month, bbl
PDQ LEASE REPORTS · FIRST JUL 2022 · LAST VOLUME OCT 2023 · STATEWIDE DATA THROUGH APR 2026
Gas by month
Gas-well gas plus casinghead gas, mcf. On an oil lease all gas is reported as casinghead. The latest months are revised upward as late reports arrive.
Last 12 months 102,837
Who reported it
Each run of months one operator filed the production report, oldest first.
- Kaler Energy Corp.Jul 2022 → Nov 2023 · 17 mo
Wells on the lease
FROM COMPLETION REPORTS · PRODUCTION ABOVE IS THEIR TOTAL
1
wells completed on the lease
- NO Type on File
- 1
Operates them now
Newest permits
- 23933960 #1RMar 27, 2023
About this data
Monthly oil, gas, and casinghead from the RRC PDQ production dump, which lags the reporting month by two to three months; figures shown through Apr 2026. Wells from completion reports; operator runs from who filed each month's report.
Developers: this page as JSON is GET /v1/data/leases/tx/g-2-295448, documented in the API reference.