LEASES · O-13-28170 · OIL · DISTRICT 09
Campbell
ReportingHays Partnership · Archer County Regular field
Campbell is an RRC oil lease (O-13-28170) in the Archer County Regular field operated by Hays Partnership, with 5 wells completed on it.
It has reported 199K barrels of oil and 21 mcf of gas since January 1993, last reporting volume in April 2026 (statewide data runs through April 2026).
The last 12 reported months total 3.69K barrels of oil, down 10% on the year before; the lease peaked at 1.63K barrels in February 2012.
3 operators have filed production on it, most recently Hays Partnership since August 2013.
- 199K
- bbl oil, all reported
- 21
- mcf gas incl. casinghead
- 3.69K
- bbl oil, last 12 reported
- -10%
- vs the 12 before
- 5
- wells completed on it
- 1.63K
- peak month, bbl (Feb 2012)
PDQ LEASE REPORTS · FIRST JAN 1993 · LAST VOLUME APR 2026 · STATEWIDE DATA THROUGH APR 2026
Oil by month
Barrels reported on Form PR for the whole lease. The latest months are revised upward as late reports arrive.
Last 12 months 3,688 · prior 12 4,099(-10%)
Gas by month
Gas-well gas plus casinghead gas, mcf. On an oil lease all gas is reported as casinghead. The latest months are revised upward as late reports arrive.
Last 12 months 0 · prior 12 0
Decline curve
None shown. Petrora fits an Arps curve only when the last ten years of oil reports follow one decline closely enough to project (R² of 0.7 or better over at least a year since the peak). This lease's recent history does not, so a projection would be a guess dressed as a number.
Who reported it
Each run of months one operator filed the production report, oldest first.
- Hays & BoydstonJan 1993 → Dec 1993 · 12 mo
- Hays, John H.Jan 1994 → Jul 2013 · 235 mo
- Hays PartnershipAug 2013 → Jul 2026 · 156 mo
Wells on the lease
FROM COMPLETION REPORTS · PRODUCTION ABOVE IS THEIR TOTAL
5
wells completed on the lease
- NO Type on File
- 5
Operates them now
Newest permits
- — #1—
- — #12—
- — #29—
- — #30—
- — #34—
About this data
Monthly oil, gas, and casinghead from the RRC PDQ production dump, which lags the reporting month by two to three months; figures shown through Apr 2026. Wells from completion reports; operator runs from who filed each month's report.
Developers: this page as JSON is GET /v1/data/leases/tx/o-13-28170, documented in the API reference.