Snorre
North Sea · Oil · Producing · Operator Equinor Energy AS
Snorre is an oil field in the North Sea operated by Equinor Energy AS, discovered in 1979 by wellbore 34/4-1. The Norwegian Offshore Directorate lists it as producing.
In the 12 months reported through August 2026 it sold 4.66 million Sm³ of oil equivalents (4.66 million Sm³ of oil, 0 billion Sm³ of gas), down 10% on the 12 months before.
Since August 1992 it has reported 271 million Sm³ of oil equivalents: 255.6 million Sm³ of oil and 6.4 billion Sm³ of gas.
5 companies hold it; the largest share is Equinor Energy AS with 33.28%.
199 wellbores are on file for the field.
- 4.66
- mill Sm³ o.e., last 12 reported -10%
- 4.66
- mill Sm³ oil, last 12
- 0
- bill Sm³ gas, last 12
- 271
- mill Sm³ o.e. since Aug 1992
- 199
- wellbores on file
- 5
- licensees today
SODIR PRODUCTION PROFILES · SALEABLE VOLUMES · REPORTED THROUGH AUG 2026
Oil by month
TEN YEARS · SM³ SOLD
Last 12 months 4,655,141 · prior 12 5,161,117(-10%)
Gas by month
TEN YEARS · SM³ SOLD
Last 12 months 0 · prior 12 0
Produced water by month
TEN YEARS · SM³ IN THE FIELD
Last 12 months 10,321,494 · prior 12 10,355,947(0%)
Licensees
SHARES TODAY · UNIT SNORRE UNIT
| Company | Share | Since |
|---|---|---|
| Equinor Energy ASOPERATOR | 33.2756% | Dec 23, 2024 |
| Petoro AS | 30% | Dec 23, 2024 |
| Vår Energi ASA | 18.5534% | Dec 23, 2024 |
| INPEX Idemitsu Norge AS | 9.6% | Dec 23, 2024 |
| Harbour Energy Norge AS | 8.5711% | Dec 23, 2024 |
Reserves
THE DIRECTORATE'S ESTIMATE · AS OF DEC 31, 2025
These are the Norwegian Offshore Directorate's own year-end estimates, shown as it publishes them. Petrora does not estimate reserves.
| Oil, mill Sm³ | Gas, bill Sm³ | NGL, mill tonnes | Condensate, mill Sm³ | O.e., mill Sm³ | |
|---|---|---|---|---|---|
| Originally recoverable | 316.2 | 8.49 | 5.67 | 0 | 335.4 |
| Remaining | 64 | 1.84 | 0.95 | 0 | 67.7 |
About the field
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
- Development
- Snorre is a field in the Tampen area in the northern part of the North Sea. The water depth is 300-350 metres. Snorre was discovered in 1979, and the plan for development and operation (PDO) was approved in 1988. The field is developed with the facilities Snorre A, located in the southern part of the field, Snorre B in the northern part and two subsea systems tied-back to Snorre A (SPS and SEP). Snorre A is a floating tension-leg platform for accommodation, drilling and processing. There is also a separate process module on Snorre A for full stabilisation of the well stream from the Vigdis field. The production from Snorre A started in 1992. The subsea production system SPS was installed on the field in 1992. It consists of one template with 20 slots for production and injection wells. In 1998, a PDO was approved for Snorre B, a semi-submersible integrated drilling, processing and accommodation facility. Snorre B started production in 2001. An amended PDO for the Snorre Expansion Project (SEP) was approved in 2018. SEP consists of six subsea templates, each with four wells, and production from the first wells started in 2020. In 2020, an amended PDO for the development of the Hywind Tampen wind farm was approved. The wind farm consists of 11 floating turbines that started supplying electricity to the Snorre and Gullfaks platforms in 2022/2023. These fields are the first in the world receiving power from a floating wind farm.
- Reservoir
- Snorre produces oil from Triassic and Lower Jurassic sandstone in the Alke and Lunde Formations and the Statfjord Group. The field consists of several large fault blocks. The reservoirs are at depths of 2000-2700 metres and have complex structures with both channels and flow barriers.
- Recovery strategy
- The field is produced with pressure support from water injection, gas injection and water alternating gas injection (WAG). From 2019, all gas is reinjected to increase oil recovery.
- Transport
- Oil and gas are separated at the Snorre A platform. The oil is stabilised at the Vigdis process module on Snorre A, then exported through the Vigdis pipeline to Gullfaks A. The oil is stored and loaded onto shuttle tankers at the Gullfaks field. All gas from Snorre and Vigdis is reinjected into the Snorre field. Fully processed oil from Snorre B is transported by pipeline to Statfjord B for storage and loading onto shuttle tankers.
- Status
- Several measures to increase oil recovery from Snorre are being considered. Possible third-party tie-ins may lead to further development of the field.
Production by year
MONTHLY ROWS ADDED UP · NEWEST FIRST
| Year | Oil, mill Sm³ | Gas, bill Sm³ | NGL, mill Sm³ | Condensate, mill Sm³ | O.e., mill Sm³ | Water, mill Sm³ |
|---|---|---|---|---|---|---|
| 20268 MONTHS | 3.03 | 0 | 0 | 0 | 3.03 | 7.03 |
| 2025 | 5.03 | 0 | 0 | 0 | 5.03 | 10.3 |
| 2024 | 5.01 | 0 | 0 | 0 | 5.01 | 9.58 |
| 2023 | 5.49 | 0 | 0 | 0 | 5.49 | 8.6 |
| 2022 | 6.06 | 0 | 0 | 0 | 6.06 | 8.64 |
| 2021 | 5.83 | 0 | 0 | 0 | 5.83 | 8.51 |
| 2020 | 3.91 | 0 | 0 | 0 | 3.91 | 5.88 |
| 2019 | 3.01 | 0.01 | 0.03 | 0 | 3.05 | 5.68 |
| 2018 | 5.33 | 0 | 0 | 0 | 5.33 | 9.71 |
| 2017 | 4.82 | 0.07 | 0.11 | 0 | 5 | 9.4 |
| 2016 | 5.72 | 0 | 0 | 0 | 5.72 | 10.6 |
| 2015 | 6.36 | 0 | 0 | 0 | 6.36 | 11.2 |
| 2014 | 5.62 | 0.01 | 0.01 | 0 | 5.63 | 10.1 |
| 2013 | 5.09 | 0.02 | 0.03 | 0 | 5.14 | 9.34 |
| 2012 | 4.45 | 0.03 | 0.03 | 0 | 4.51 | 7.85 |
| 2011 | 5.52 | 0.12 | 0.09 | 0 | 5.73 | 7.72 |
| 2010 | 5.83 | 0.14 | 0.1 | 0.01 | 6.07 | 8.12 |
| 2009 | 6.01 | 0.14 | 0.1 | 0.01 | 6.25 | 6.78 |
| 2008 | 8.47 | 0.23 | 0.18 | 0 | 8.89 | 8.47 |
| 2007 | 8.38 | 0.06 | 0.08 | 0 | 8.53 | 9.81 |
| 2006 | 8.32 | 0.15 | 0.22 | 0 | 8.68 | 7.81 |
| 2005 | 8.96 | 0.34 | 0.4 | 0 | 9.7 | 5.9 |
| 2004 | 11.5 | 0.19 | 0.26 | 0 | 12 | 7.41 |
| 2003 | 13.6 | 0.41 | 0.67 | 0 | 14.7 | 7.1 |
| 2002 | 12.6 | 0.45 | 0.94 | 0 | 14 | 6.13 |
| 2001 | 11.5 | 0.52 | 0.98 | 0 | 13 | 6.35 |
| 2000 | 8.59 | 0.29 | 0.53 | 0 | 9.41 | 6.29 |
| 1999 | 9.4 | 0.31 | 0.56 | 0 | 10.3 | 0 |
| 1998 | 10.1 | 0.46 | 0.61 | 0 | 11.2 | 0 |
| 1997 | 10.8 | 0.58 | 0.57 | 0 | 11.9 | 0 |
| 1996 | 11.5 | 0.61 | 0.63 | 0 | 12.7 | 0 |
| 1995 | 11.4 | 0.63 | 0.68 | 0 | 12.7 | 0 |
| 1994 | 9.87 | 0.45 | 0.61 | 0 | 10.9 | 0 |
| 1993 | 6.91 | 0.22 | 0.5 | 0 | 7.62 | 0 |
| 19925 MONTHS | 1.56 | 0 | 0.09 | 0 | 1.64 | 0 |
Wellbores
Production 92 · Injection 82 · Appraisal 12 · Observation 6 · Shallow gas 6 · Wildcat 1
All 199 wellbores in Snorre, searchable → · Discovery wellbore 34/4-1 →
Operator history
- Equinor Energy ASMay 16, 2018 to today
- Statoil Petroleum ASNov 1, 2009 to May 15, 2018
- StatoilHydro Petroleum ASJan 1, 2009 to Oct 31, 2009
- StatoilHydro ASAOct 1, 2007 to Dec 31, 2008
- Statoil ASA (old)Jan 1, 2003 to Sep 30, 2007
- Norsk Hydro Produksjon ASJan 11, 2001 to Dec 31, 2002
- Saga Petroleum ASAMay 27, 1988 to Jan 10, 2001
This field on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Production is saleable volume by month from the Directorate's profiles, cut at the latest month any field has reported; yearly and cumulative figures are those months added up. Shares are the current rows of the field's licensee history. Reserves are the Directorate's estimate.
Developers: this page as JSON is GET /v1/data/norway/fields/43718, documented in the API reference.