NORWAY · WELLBORES · NPDID 238
1/5-2
Exploration · Wildcat · P&A · Oil · Phillips Petroleum Company Norway · Flyndre · PL 018
1/5-2 is a wildcat exploration wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Oct 19, 1973, to 4,287 m in the Zechstein Gp.
Discovery 1/5-2 Flyndre · On the map →
- 4,287
- m total depth · 4,287 m vertical
- 70
- m water depth
- Oct 19, 1973
- entered · completed Apr 15, 1974
- Zechstein Gp
- at total depth · Late Permian
- —
- m of core
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED APR 15, 1976
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- OCEAN VIKING · Semisub steel
- Drilling days
- 179
- Kelly bushing elevation
- 27 m
- Maximum inclination
- 2°
- Drilling permit
- 100-L
- Licensing round
- 1-A
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- No
- Position · ED50
- 56.57822° N, 2.64181° E
- Hydrocarbons in
- Forties Fm · Paleocene
- Hydrocarbons in
- Hod Fm · Campanian
- Hydrocarbons in
- Tor Fm · Campanian
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
The Flyndre well (1/5-2) was drilled on a structural high situated in the Feda Graben of the North Sea close to the UK border. The principle objective horizons were the Paleocene and Jurassic sand sections which had produced oil in the UK 30/13-2 well and the NO 2/7-3 wells. It was estimated that at Paleocene depth the structure was an irregular dome about 4 miles in diameter, with 12 square miles of closure and 290 ft (88.4 m) of vertical relief while at Jurassic depth the structure was a NW-SE trending anticline 4.5 miles by 3.5 miles with 12 square miles of closure at 190 ft (57.9 m) of vertical relief. Planned TD was 15000 ft (4572 m), Triassic sands, or the Zechstein Group, whichever came first.
Operations and results
Well 1/5-2 was spudded on 19 October 1973, 15 m away from the original Flyndre well 1/5-1, which was junked at 491 m for technical reasons. Well 1/5-2 was drilled with the semi-submersible installation Ocean Viking. Total depth was set at 4287 m in Late Permian Zechstein salt. The well was drilled with seawater and hi-vis pills down to 494 m. The rest of the well was drilled with lignosulphonate mud.
The well had shows throughout the Paleocene and Late Cretaceous sections and four drill-stem tests were carried out.
The top sand in Paleocene at 2832 m (Forties Formation sand) produced oil upon testing. Mud log shows were present in the Danian, but testing proved the section to be tight and unproductive. A thick Late Cretaceous section was encountered with oil shows at the top of the Maastrichtian (Tor Formation) and in the Campanian (Lower Tor and Hod Formation) sections. Drill-stem t
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.