6407/7-1 S is a wildcat exploration wellbore in the Norwegian Sea, drilled by Norsk Hydro Produksjon AS, entered Oct 19, 1985, to 3,950 m in the Red Beds (informal).

Discovery 6407/7-1 S Njord · On the map →

3,950
m total depth · 3,925 m vertical
328
m water depth
Oct 19, 1985
entered · completed Apr 7, 1986
Red Beds (informal)
at total depth · Late Triassic
314.6
m of core in 16 cores
138
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED APR 7, 1988

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
POLAR PIONEER · Semisub steel
Drilling days
171
Kelly bushing elevation
23 m
Maximum inclination
9.80000019°
Drilling permit
486-L
Licensing round
9
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
64.27541° N, 7.20587° E
Hydrocarbons in
Ile Fm · Middle Jurassic
Hydrocarbons in
Tilje Fm · Early Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 6407/7-1 S is located ca 30 km west of the Draugen field on the Njord A-structure in the southern part of the Halten Terrace. The apex of the A-structure is at about 2600 m MSL. The structure has a complex geology with dense faulting. The objective was to test for hydrocarbons in the structure, with the Middle and Early Jurassic as the primary and secondary targets. In addition, the well should obtain reservoir data from the Middle and Early Jurassic reservoir sandstones and establish a better stratigraphical, sedimentological, and structural knowledge of the area. The well should penetrate a deep reflector interpreted to be the "Top Middle Triassic Evaporite reflector". The prognosed total depth was 4025 m.

Operations and results

Wildcat well 6407/7 1 S was spudded with the semi-submersible installation Polar Pioneer 19 October 1985 and was drilled to TD at 3950 m in Triassic rocks. Ca 30 days (17%) of the rig time was down time. Major causes for this were sub sea problems with orienting the temporary guide base, bad weather, and fishing for various objects and stuck tools. In addition the section from ca 746 to 1177 m required wiper trips and a lot of reaming to clean the hole. This added several days to the drilling time. The well was vertical down to 1177 m, it built deviation angle up to maximum 9.8 deg at 1460 m, and had a deviation between 9.8 and 3.0 deg from there to TD. The well was drilled with spud mud down to 1172 m, with KCl/polymer mud from 1172 m to 2710 m, with gel/polymer mud from 2710 m to 3601 m, and with gel/lignosulphonate mud from 3610 m to TD.

The top of the reservoir came in at 2759 m, 70.5 m higher than prognosed. Oil was discovered in three separate reservoir units. The upper reservoir (2759 - 2783.5 m) consisted of sandstones belonging to the Fangst Group and Ror Formation. Relative pressure in this unit was 1.35 g/cc. The main reservoir (2839 -2988 m) consisted of sandstones be

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/474, documented in the API reference.