WELL · 42-001-30983 · DISTRICT 6

Temple-Eastex Inc. #2

Plugged

Anderson County · Yellow Branch (Wilcox 2530) field  · Vertical

Temple-Eastex Inc. #2 (API 42-001-30983) is a plugged well in Anderson County, plugged August 31, 1982, last operated by Basin Operating CO. Ltd..

The RRC has issued 3 drilling permits between 1980 and 2001, permitted to 6,100 ft.

It was permitted by Jla Resources Company and has since transferred to Basin Operating CO. Ltd. on the wellbore schedule.

Completion filings report one formation top, including Wilcox.

Its 2 leases have reported 880K barrels of oil and 106K mcf of gas since November 1996, last reporting in July 2026. The leases carry 29 wells, so these are lease totals, not this well alone.

Operator of record

Basin Operating Co. Ltd.

Permitted by Jla Resources Company; the EWA schedule now lists a different operator.

Tyler, TX · P-5 Y, filed Oct 8, 1993 · 118 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBasin Operating Co. Ltd.
Production reportsJla Resources Companythrough Jan 2026
Latest permitJla Resources CompanyDec 13, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,100
total depth, ft
3
permits on file
Dec 13, 2001
last permit issued
Sep 5, 1980
completed
880K
cumulative oil, bbl
106K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 5, 1980
Shut in
—
Plugged
Aug 31, 1982

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 29 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Temple Inland O-6-13622Anwac (1400 Wilcox)Jla Resources Company28880K106KNov 1996 – Jul 2026
Temple Inland O-6-13881WildcatJla Resources Company100Apr 1997 – Feb 2002

Oil, barrels lease total

Last 12 months 16,970 · prior 12 22,710(-25%)

01K2K3K202420252026

Gas, mcf lease total

Last 12 months 1,953 · prior 12 2,722(-28%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jla Resources CompanyNov 1996 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
516117-99RecompletionJla Resources CompanyDec 13, 2001Dec 13, 2001Oct 25, 20012,000
456259-99ReenterJla Resources CompanyDec 12, 1996Dec 12, 1996Dec 17, 19961,600
82787-99DrillBasin Operating Co. Ltd.Jun 3, 1980Jun 3, 1980Jul 29, 19806,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-13622————
—— O-6-13881————

Formation tops

As filed on W-2/G-1. Subsea from 397 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxTOP WILCOX775-378
WilcoxBASE WILCOX2,698-2,301

Perforations

Perforated and open-hole intervals.

FromToType
1,4221,428Perforated
1,4221,430Perforated
2,5312,534Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62534112.25180 S
9.62534112.5180 S
2.3752,510——
5.53,0138.75900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 11, 2002Dec 20, 2001—
00Feb 13, 2002Feb 22, 1999—
00May 13, 1999Feb 22, 1999—
00Apr 15, 1999——
00Jan 12, 1984Oct 28, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00130983, documented in the API reference.