WELL · 42-001-31314 · DISTRICT 6
Wylie SO A #2
Anderson County · Carol Jean (James Lime) field · Vertical
Wylie SO A #2 (API 42-001-31314) is a plugged well in Anderson County, plugged September 23, 2015, last operated by O Benco Inc..
The RRC has issued one drilling permit, issued December 18, 1981, permitted to 10,600 ft.
It was permitted by Mole Operating CO., Inc. and has since transferred to O Benco Inc. on the wellbore schedule.
Completion filings report 4 formation tops, including Woodbine, Paluxy, Rodessa, James Lime.
Its lease has reported 41K barrels of oil and 592K mcf of gas since January 1993, last reporting in November 2015.
Operator of record
Permitted by Mole Operating Co., Inc.; the EWA schedule now lists a different operator.
Shreveport, LA · P-5 Y, filed Mar 11, 2022 · 374 permits on file · (318) 865-8568
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | O Benco Inc. |
| Production reports | O'Benco, Inc.through Feb 2013 |
| Latest permit | Mole Operating Co., Inc.Dec 18, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,600
- total depth, ft
- 1
- permits on file
- Dec 18, 1981
- last permit issued
- Feb 10, 1982
- completed
- 41K
- cumulative oil, bbl
- 592K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 10, 1982
- Shut in
- —
- Plugged
- Sep 23, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wylie, SO "A" O-6-11911 | Carol Jean (James Lime) | O'Benco, Inc. | 1 | 41K | 592K | Jan 1993 – Nov 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Big Run Production CompanyJan 1993 → Jun 1999
- 2O'Benco, Inc.Jul 1999 → Feb 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 144833-99 | Drill | Mole Operating Co., Inc. | Dec 18, 1981 | Dec 18, 1981 | — | 10,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-11911 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 464 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Woodbine | 5,010 | -4,546 |
| Paluxy | 7,460 | -6,996 |
| Rodessa | 9,680 | -9,216 |
| James LimeJAMES | 10,050 | -9,586 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,065 | 10,071 | Perforated |
| 10,088 | 10,098 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,760 | 11 | 400 S |
| 2.375 | 10,060 | — | — |
| 4.5 | 10,461 | 7.875 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 3, 1986 | Feb 7, 1985 | — |
| 00 | Apr 1, 1986 | — | — |
| 00 | Apr 4, 1985 | Feb 7, 1985 | — |
| 00 | Apr 2, 1985 | — | — |
| 00 | Jan 12, 1984 | Feb 12, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-001-31314 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-001-31314 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00131314, documented in the API reference.