WELL · 42-001-31408 · DISTRICT 6
Holland #1
Anderson County · Purt W. (Rodessa 10 200) field · Vertical
Holland #1 (API 42-001-31408) is a plugged well in Anderson County, plugged January 27, 2022, last operated by Southwest Operating Inc.-Tyler.
The RRC has issued one drilling permit, issued April 15, 1983, permitted to 10,800 ft.
It was permitted by Marshall Expl. Inc. and has since transferred to Southwest Operating Inc.-Tyler on the wellbore schedule.
Completion filings report 4 formation tops, including B/Austin Chalk, Georgetown, Glen Rose, B/Massive Anhydrite.
Operator of record
Southwest Operating Inc.-Tyler
Permitted by Marshall Expl. Inc.; the EWA schedule now lists a different operator.
Tyler, TX · P-5 Y, filed Feb 4, 2026 · 63 permits on file · (903) 530-1563
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Southwest Operating Inc.-Tyler |
| Production reports | Southwest Operating, Inc.-Tylerthrough Jul 2018 |
| Latest permit | Marshall Expl. Inc.Apr 15, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,800
- total depth, ft
- 1
- permits on file
- Apr 15, 1983
- last permit issued
- May 26, 1983
- completed
- 0
- cumulative oil, bbl
- 144K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2022
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 26, 1983
- Shut in
- —
- Plugged
- Jan 27, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Holland G-6-130767 | Purt,w. (Rodessa 10,200) | Southwest Operating, Inc.-Tyler | 1 | 0 | 144K | Jan 1993 – Jul 2022 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Strago Petroleum CorporationJan 1993 → Jul 1993
- 2Buffco Production Inc.Aug 1993 → Jul 2012
- 3Southwest Operating, Inc.-TylerOct 2012 → Jul 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 191652-99 | Drill | Marshall Expl. Inc. | Apr 15, 1983 | Apr 15, 1983 | — | 10,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-130767 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 603 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B/Austin Chalk | 5,175 | -4,572 |
| Georgetown | 6,690 | -6,087 |
| Glen RoseGLENROSE | 8,317 | -7,714 |
| B/Massive Anhydrite | 10,200 | -9,597 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,367 | 10,398 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,173 | 12.25 | 750 S |
| 2.875 | 10,298 | — | — |
| 5.5 | 10,650 | 8.75 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 23, 1989 | Apr 27, 1989 | — |
| 00 | Jun 2, 1989 | — | — |
| 00 | Jan 12, 1984 | Jun 6, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-001-31408 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-001-31408 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00131408, documented in the API reference.