WELL · 42-001-31813 · DISTRICT 6
Nickelson B. W. #1
Anderson County · Muse Church (Woodbine) field · Vertical
Nickelson B. W. #1 (API 42-001-31813) is a plugged well in Anderson County, plugged April 25, 2012, last operated by Browning Landon.
The RRC has issued one drilling permit, issued December 10, 1987, permitted to 6,125 ft.
It was permitted by Shreveport Oil & Gas Company and has since transferred to Browning Landon on the wellbore schedule.
Completion filings report 3 formation tops, including Midway, Pecan Gap, Austin Chalk.
Its lease has reported 2.54K barrels of oil and 38 mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Permitted by Shreveport Oil & Gas Company; the EWA schedule now lists a different operator.
Brenham, TX · P-5 Y, filed Dec 4, 2025
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Browning Landon |
| Production reports | Wilson, Don H., Inc.through Feb 1996 |
| Latest permit | Shreveport Oil & Gas CompanyDec 10, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,125
- total depth, ft
- 1
- permits on file
- Dec 10, 1987
- last permit issued
- Jan 26, 1988
- completed
- 2.54K
- cumulative oil, bbl
- 38
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 26, 1988
- Shut in
- —
- Plugged
- Apr 25, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nickelson, B. W. O-6-12303 | Muse Church (Woodbine) | Browning, Landon | 1 | 2.54K | 38 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Wilson Operating Service IncJan 1993 → Apr 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 340043-99 | Drill | Shreveport Oil & Gas Company | Dec 10, 1987 | Dec 10, 1987 | — | 6,125 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-12303 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 270 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Midway | 2,630 | -2,360 |
| Pecan Gap | 4,184 | -3,914 |
| Pecan GapBASE PECAN GAP | 4,596 | -4,326 |
| Austin Chalk | 5,080 | -4,810 |
| Austin ChalkBASE AUSTIN CHALK | 5,302 | -5,032 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,320 | 5,321 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 5.5 | 5,405 | 7.875 | 1,377 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 2, 1988 | Feb 18, 1988 | — |
| 00 | Apr 8, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-001-31813 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-001-31813 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00131813, documented in the API reference.