WELL · 42-001-32009 · DISTRICT 6
Roberson #1
Anderson County · Vertical
Roberson #1 (API 42-001-32009) is a plugged well in Anderson County, plugged April 7, 1991, last operated by Machin & Associates, Inc..
The RRC has issued 2 drilling permits between 1991 and 2006, permitted to 4,300 ft.
Completion filings report 2 formation tops, including Austin Chalk, Woodbine.
Operator of record
Longview, TX · P-5 Y, filed Dec 4, 2025 · 78 permits on file · (903) 738-5181
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Machin & Associates, Inc.through Nov 2007 |
| Latest permit | Machin & Associates, Inc.Jun 22, 2006 |
- 4,300
- total depth, ft
- 2
- permits on file
- Jun 22, 2006
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 6.86K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2006 THROUGH Mar 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Apr 7, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Roberson G-6-222470 | Boggy Creek* | Machin & Associates, Inc. | 1 | 0 | 6.86K | Sep 2006 – Mar 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Machin & Associates, Inc.Feb 2007 → Nov 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 616868-99 | Reenter | Machin & Associates, Inc. | Mar 31, 2006 | Jun 22, 2006 | — | 3,900 |
| 382237-99 | Drill | Laser Exploration Inc. | Dec 11, 1990 | Jan 17, 1991 | Mar 27, 1991 | 4,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-222470 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 316 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin ChalkBASE AUSTIN CHALK | 3,670 | -3,354 |
| WoodbineTOP WOODBINE | 3,722 | -3,406 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,767 | 3,772 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 620 | 12.25 | 140 S |
| 4.5 | 3,937 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 29, 2007 | Oct 17, 2006 | Yes |
| 00 | Dec 1, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-001-32009 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-001-32009 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00132009, documented in the API reference.