WELL · 42-001-32196 · DISTRICT 6

Pierson #1

Plugged

Anderson County · Elkhart (Woodbine) field  · Vertical

Pierson #1 (API 42-001-32196) is a plugged well in Anderson County, plugged May 10, 1996, last operated by Calto Operating Company Inc..

The RRC has issued one drilling permit, issued February 18, 1994, permitted to 6,200 ft.

It was permitted by Teco Operating Company and has since transferred to Calto Operating Company Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Austin Chalk, Woodbine.

Operator of record

Calto Operating Company Inc.

Permitted by Teco Operating Company; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Mar 5, 2004 · 22 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCalto Operating Company Inc.
Production reportsCalto Operating Company, Inc.through Feb 1996
Latest permitTeco Operating CompanyFeb 18, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,200
total depth, ft
1
permits on file
Feb 18, 1994
last permit issued
May 26, 1994
completed
0
cumulative oil, bbl
333K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1994 THROUGH Jul 1996

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 26, 1994
Shut in
—
Plugged
May 10, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pierson G-6-150243Elkhart (Woodbine)Calto Operating Company, Inc.10333KMay 1994 – Jul 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Teco Operating CompanyJul 1994 → Dec 1995
  2. 2Calto Operating Company, Inc.Jan 1996 → Feb 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
420179-99DrillTeco Operating CompanyJan 13, 1994Feb 18, 1994Mar 25, 19946,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-150243————

Formation tops

As filed on W-2/G-1. Subsea from 272 ft elevation.Download CSV →

FormationMD ftSubsea
Austin ChalkTOP OF AUSTIN CHALK5,006-4,734
Austin ChalkBASE AUSTIN CHALK5,248-4,976
Woodbine5,334-5,062

Perforations

Perforated and open-hole intervals.

FromToType
5,4385,441Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
7.62562311221 S
4.55,5746.75388 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 4, 1994Jun 13, 1994Yes
00Aug 2, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00132196, documented in the API reference.