WELL · 42-001-32214 · DISTRICT 6

May Lena #1

Y

Anderson County · Broom City (Upper Woodbine) field · Injection  · Vertical

May Lena #1 (API 42-001-32214) is a well in Anderson County operated by Supreme Energy Company Inc., completed May 1, 1995 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued March 29, 1995, permitted to 6,000 ft.

It was permitted by Petroreal Inc. and has since transferred to Supreme Energy Company Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Pecan Gap, Austin Chalk, Woodbine.

Its lease has reported 5.01K barrels of oil and 9.2K mcf of gas since May 1995, last reporting in July 2026.

It holds an active disposal or injection permit, with 4.97K barrels injected in the 12 months reported through November 2025.

Operator of record

Supreme Energy Company Inc.

Permitted by Petroreal Inc.; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Nov 4, 2025 · 19 permits on file · (325) 660-7330

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSupreme Energy Company Inc.
Production reportsPetroreal Inc.through May 1997
Latest permitPetroreal Inc.Mar 29, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,000
total depth, ft
1
permits on file
Mar 29, 1995
last permit issued
May 1, 1995
completed
5.01K
cumulative oil, bbl
9.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 1, 1995
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
May, Lena O-6-13445Broom City (Upper Woodbine)Supreme Energy Company, Inc.15.01K9.2KMay 1995 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Petroreal Inc.May 1995 → Apr 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
433732-99DrillPetroreal Inc.Mar 13, 1995Mar 29, 1995Apr 12, 19956,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-13445————

Formation tops

As filed on W-2/G-1. Subsea from 450 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap4,390-3,940
Austin Chalk5,160-4,710
Woodbine5,440-4,990

Perforations

Perforated and open-hole intervals.

FromToType
5,4415,448Perforated
5,4705,500Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62585011220 S
5.55,5507.875265 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 16, 1998Sep 11, 1998—
00Dec 13, 1995Jul 11, 1995Yes
00Oct 17, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

4.97K
bbl, last 12 reported months
2.62M
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000087194H-1 InjectionActive10,0002,7005,470–5,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 4,970 · prior 12 49,176(-90%)

010K20K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00132214, documented in the API reference.