WELL · 42-001-32254 · DISTRICT 6
Cartmell-Collier Unit #1
Anderson County · Long Lake (Woodbine) field · Vertical
Cartmell-Collier Unit #1 (API 42-001-32254) is a well in Anderson County operated by Seistech Development Inc., completed January 31, 1997.
The RRC has issued one drilling permit, issued November 13, 1996, permitted to 6,500 ft.
Completion filings report 3 formation tops, including Pecan Gap, Austin Chalk, Woodbine.
Its 2 leases have reported 65K barrels of oil and 3.75K mcf of gas since February 1997, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Midland, TX · P-5 Y, filed Nov 6, 2020 · 9 permits on file · (432) 683-5474
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Seistech Development Inc. |
| Production reports | Linder, John Operating Co., LLCthrough Apr 2026 |
| Latest permit | Seistech Development, Inc.Nov 13, 1996 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,500
- total depth, ft
- 1
- permits on file
- Nov 13, 1996
- last permit issued
- Jan 31, 1997
- completed
- 65K
- cumulative oil, bbl
- 3.75K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 1997 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 31, 1997
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cartmell-Collier Unit O-6-14525 | Long Lake | Linder, John Operating Co., LLC | 1 | 19.6K | 300 | Aug 2006 – Jul 2026 |
| Cartmell-Collier Unit O-6-13629 | Long Lake (Woodbine) | Seistech Development, Inc. | 1 | 45.5K | 3.45K | Feb 1997 – Nov 2006 |
Oil, barrels lease total
Last 12 months 80 · prior 12 115(-30%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Seistech Development, Inc.Feb 1997 → May 2007
- 2Falcon Resources, Inc.Jun 2007 → Nov 2019
- 3Linder, John Operating Co., LLCAug 2021 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 454895-99 | Drill | Seistech Development, Inc. | Nov 7, 1996 | Nov 13, 1996 | Jan 17, 1997 | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-13629 | — | — | — | — |
| — | — O-6-14525 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 362 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pecan GapPECAN GAP CHALK-TOP | 3,725 | -3,363 |
| Austin ChalkAUSTIN CHALK-TOP | 4,843 | -4,481 |
| WoodbineWOODBINE-TOP | 5,105 | -4,743 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,380 | 5,382 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 531 | 11 | 164 S |
| 5.5 | 5,495 | 7.875 | 325 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 9, 2006 | Feb 12, 1997 | Yes |
| 00 | Apr 4, 1997 | Feb 12, 1997 | Yes |
| 00 | Mar 17, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-001-32254 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-001-32254 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00132254, documented in the API reference.