WELL · 42-001-32718 · DISTRICT 6
Royall Trust Unit #1
Anderson County · Blackfoot Field field · Producing · Vertical
Royall Trust Unit #1 (API 42-001-32718) is a well in Anderson County operated by Craton Operating LLC, completed April 23, 2013 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued September 12, 2012, permitted to 10,300 ft.
It was permitted by Ironwood Oil & Gas LLC and has since transferred to Craton Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Pettit, Rodessa, Travis Peak.
Its lease has reported 27.8K barrels of oil since April 2013, last reporting in July 2026.
Operator of record
Permitted by Ironwood Oil & Gas LLC; the EWA schedule now lists a different operator.
Bellaire, TX · P-5 Y, filed Mar 4, 2026 · 14 permits on file · (713) 900-3456
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Craton Operating LLC |
| Production reports | Craton Operating LLCthrough Dec 2025 |
| Latest permit | Ironwood Oil & Gas LLCSep 12, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,300
- total depth, ft
- 1
- permits on file
- Sep 12, 2012
- last permit issued
- Apr 23, 2013
- completed
- 27.8K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 23, 2013
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Royall Trust Unit O-6-15204 | Blackfoot Field | Craton Operating LLC | 1 | 27.8K | 0 | Apr 2013 – Jul 2026 |
Oil, barrels lease total
Last 12 months 455 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Ironwood Oil & Gas LLCMay 2013 → Jun 2014
- 2Cl&f Operating LLCJul 2014 → Apr 2020
- 3Craton Operating LLCJun 2020 → Dec 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 746538-99 | Drill | Ironwood Oil & Gas LLC | Aug 16, 2012 | Sep 12, 2012 | Nov 22, 2012 | 10,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-15204 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 448 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| PettitPETTET | — | — |
| Rodessa | — | — |
| Travis Peak | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,125 | 10,080 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,818 | 12.25 | 930 S |
| 5.5 | 10,285 | 8.75 | 635 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 19, 2013 | May 9, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-001-32718 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-001-32718 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.