WELL · 42-001-32737 · DISTRICT 6

Herrington #1

N

Anderson County · Wildcat field  · Horizontal

Herrington #1 (API 42-001-32737) is a horizontal well in Anderson County operated by Jamex Inc., completed January 4, 2014.

The RRC has issued one drilling permit (amended once), issued November 7, 2013, permitted to 12,500 ft.

Completion filings report 5 formation tops, including Austin Chalk, Buda, Pecan Gap, Sub-Clarksville.

Its 2 leases have reported 72.9K barrels of oil since January 2014, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Jamex Inc.

Lewisville, TX · P-5 Y, filed Apr 4, 2026 · 331 permits on file · (800) 880-1552

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJamex Inc.
Production reportsJamex, Inc.through Mar 2026
Latest permitJamex, Inc.Nov 7, 2013
12,500
total depth, ft
2
permits on file
Nov 7, 2013
last permit issued
Jan 4, 2014
completed
72.9K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 4, 2014
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Herrington O-6-15285Purt, E. (Goodland)Jamex, Inc.172.9K0May 2014 – Jul 2026
Herrington O-6-15282WildcatJamex, Inc.100Jan 2014 – Jul 2014

Oil, barrels lease total

Last 12 months 2,498 · prior 12 2,750(-9%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jamex, Inc.May 2014 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
772940-98DrillJamex, Inc.Dec 2, 2013Nov 7, 2013Nov 26, 201312,500
772940-99DrillJamex, Inc.Oct 31, 2013Nov 7, 2013Nov 26, 201312,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-15282————
—— O-6-15285————

Formation tops

As filed on W-2/G-1. Subsea from 405 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk——
Buda——
Pecan Gap——
Sub-Clarksville——
Woodbine——

Perforations

Perforated and open-hole intervals.

FromToType
8,47514,698Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,05012.251,070 S
5.514,7898.751,990 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 9, 2014Jul 1, 2014—
00Jul 8, 2014Mar 31, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00132737, documented in the API reference.