WELL · 42-001-32788 · DISTRICT 6

Bethel SWD #4

WaterN

Anderson County · Bethel (Woodbine) field  · Vertical

Bethel Swd #4 (API 42-001-32788) is a well in Anderson County operated by Atmos Pipeline - Texas, completed November 21, 2019.

The RRC has issued one drilling permit (amended once), issued April 2, 2019, permitted to 6,500 ft.

Completion filings report 9 formation tops, including Pecan Gap, Austin Chalk, Eagle Ford, Sub-Clarksville.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 198K barrels injected in the 12 months reported through November 2025; TexNet located 0 M2+ earthquakes within 10 km over the last two years.

Operator of record

Atmos Pipeline - Texas

Dallas, TX · P-5 Y, filed Jun 4, 2026 · 96 permits on file · (800) 442-7259

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAtmos Pipeline - Texas
Production reportsnone
Latest permitAtmos Pipeline - TexasApr 2, 2019
6,500
total depth, ft
2
permits on file
Apr 2, 2019
last permit issued
Nov 21, 2019
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2019 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 21, 2019
Shut in
—
Plugged
—

Surface location

31.916258, -95.926920

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Anderson County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bethel SWD G-6-290025Bethel (Woodbine)Atmos Pipeline - Texas100Nov 2019 – Jul 2026
Bethel SWD O-6-15746Bethel (Woodbine)Atmos Pipeline - Texas200Nov 2019 – Mar 2021

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
851696-98DrillAtmos Pipeline - TexasApr 17, 2019Apr 2, 2019Jun 9, 20196,500
851696-99DrillAtmos Pipeline - TexasApr 2, 2019Apr 2, 2019Jun 9, 20196,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-290025————
—— O-6-15746————

Formation tops

As filed on W-2/G-1. Subsea from 401 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan GapPECAN GAP - PROBLEM IN SW AREA O3,605-3,204
Austin Chalk4,862-4,461
Eagle Ford5,345-4,944
Eagle FordEAGLEFORD5,345-4,944
Sub-Clarksville5,682-5,281
Woodbine5,810-5,409
James Lime——
Pecan GapPECAN GAP - PROBLEM IN SW AREA O——
PettitPETTET——
Rodessa——
Travis Peak——

Perforations

Perforated and open-hole intervals.

FromToType
5,9805,994Perforated
6,0076,067Perforated
6,1066,134Perforated
6,3716,373Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,59617.5990 S
9.6256,43512.25720 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 15, 2020Jul 16, 2020—
00May 27, 2020Jan 27, 2020—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Bethel SWD42-001-32789

0.6 KM · Atmos Pipeline - Texas · Section with this well →

Pecan Gap3,526-3,129
Austin Chalk4,790-4,393
Eagle Ford5,260-4,863
Sub-Clarksville5,682-5,285
Woodbine5,702-5,305
Maness6,300-5,903
Buda6,370-5,973
Pettit—

11 TOPS · FIRST 8

Brookside SWD42-001-32791

0.7 KM · Atmos Pipeline - Texas · Section with this well →

Pecan Gap3,660-2,721
Austin Chalk4,962-4,023
Eagle Ford5,392-4,453
Sub-Clarksville5,682-4,743
Woodbine5,832-4,893
Maness6,392-5,453
Buda6,482-5,543
Rodessa—

10 TOPS · FIRST 8

Trinity Gas Storage Unit42-001-32844

1.9 KM · Trinity Gas Storage, LLC · Section with this well →

Pecan Gap3,515-3,170
Sub-Clarksville5,261-4,916
Woodbine5,625-5,280
Rodessa7,908-7,563
James Lime—
Pettit—
Travis Peak—

Trinity Gas Storage Unit42-001-32845

1.9 KM · Trinity Gas Storage, LLC · Section with this well →

Pecan Gap3,528-3,183
Sub-Clarksville5,220-4,875
Woodbine5,652-5,307
Rodessa7,826-7,481
Pettit—
James Lime—
Travis Peak—

Trinity Gas Storage Unit42-001-32846

1.9 KM · Trinity Gas Storage, LLC · Section with this well →

Pecan Gap3,494-3,149
Sub-Clarksville5,203-4,858
Woodbine5,642-5,297
Rodessa7,675-7,330
Pettit—
James Lime—
Travis Peak—

Trinity Gas Storage Unit42-001-32847

1.9 KM · Trinity Gas Storage, LLC · Section with this well →

Pecan Gap3,435-3,090
Sub-Clarksville5,229-4,884
Woodbine5,580-5,235
Rodessa7,830-7,485
Travis Peak—
James Lime—
Pettit—

Trinity Gas Storage Unit42-001-32854

1.9 KM · Trinity Gas Storage, LLC · Section with this well →

Pecan Gap3,433-3,088
Sub-Clarksville5,198-4,853
Woodbine5,606-5,261
Rodessa7,852-7,507
James Lime—
Travis Peak—
Pettit—

Trinity Gas Storage Unit42-001-32862

1.9 KM · Trinity Gas Storage, LLC · Section with this well →

Pecan Gap3,227
Sub-Clarksville5,186
Woodbine5,585
Rodessa7,822
Pettit—
Travis Peak—
James Lime—

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

198K
bbl, last 12 reported months
32.8M
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000118737H-1 InjectionActive50,0002,9055,810–6,400

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 197,575 · prior 12 2,163,872(-91%)

0500K1M20242025

TexNet catalog via USGS

Seismicity near this well

0
M2+ events within 10 km, last 2 years
—
largest

A proximity count, not an attribution. How to read it →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00132788, documented in the API reference.