WELL · 42-003-00443 · DISTRICT 8

University BLK.9 /Wolfcamp/ Unit #1H

N

Andrews County · University Block 9 (Wolfcamp) field  · Vertical

University Blk.9 /Wolfcamp/ Unit #1H (API 42-003-00443) is a well in Andrews County operated by Xto Energy Inc., completed January 5, 1990.

The RRC has issued 2 drilling permits between 2001 and 2004, permitted to 10,204 ft.

Its 3 leases have reported 7.4M barrels of oil and 15.1M mcf of gas since January 1993, last reporting in July 2026. The leases carry 136 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 34.8K barrels injected in the 12 months reported through February 2026.

Operator of record

XTO Energy Inc.

Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,153 permits on file · (832) 625-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitXTO Energy Inc.Jan 29, 2004
10,204
total depth, ft
2
permits on file
Jan 29, 2004
last permit issued
Jan 5, 1990
completed
7.4M
cumulative oil, bbl
15.1M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 5, 1990
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 136 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
University BLK.9 /Wolfcamp/ Unit O-10-15046University Block 9 (Wolfcamp)XTO Energy Inc.663.83M7.63MJan 1993 – Jul 2026
University Block 9 /Penn/ Unit O-10-21413University Block 9 (Penn.)XTO Energy Inc.703.56M7.45MJan 1993 – Jul 2026
— O-10-29759——000—

Oil, barrels lease total

Last 12 months 39,152 · prior 12 56,637(-31%)

05K10K202420252026

Gas, mcf lease total

Last 12 months 163,186 · prior 12 228,046(-28%)

020K40K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko Petroleum CorporationJan 1993 → Nov 1995
  2. 2Cross Timbers Operating CompanyJan 1993 → May 2001
  3. 3XTO Energy Inc.Jun 2001 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
541219-99RecompletionXTO Energy Inc.Jan 26, 2004Jan 29, 2004Apr 8, 20049,065
509638-99RecompletionCross Timbers Operating CompanyMay 31, 2001Jun 4, 2001Mar 22, 200110,204

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-15046————
—— O-10-15046————
—— O-10-21413————
—— O-10-29759————

Perforations

Perforated and open-hole intervals.

FromToType
8,3058,456Perforated
8,3908,396Perforated
8,3988,403Perforated
8,4108,456Perforated
8,5288,680Perforated
9,1029,145Perforated
—10,450Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37536517.5350 S
9.6254,50612.252,200 S
710,3158.75350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 7, 2010Oct 26, 2007—
00Jul 1, 2010Jun 1, 2004—
00Mar 24, 2010Jun 15, 2001Yes
00Apr 24, 2002Jun 15, 2001Yes
00Mar 15, 2002May 3, 1990—
00Jun 19, 1990May 3, 1990—
00May 10, 1985——
00May 1, 1985——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

34.8K
bbl, last 12 reported months
2.83M
bbl, all reported
Feb 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000093754H-1 InjectionActive5,0003,0008,245–8,730

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 34,799 · prior 12 0

05K10K15K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00300443, documented in the API reference.