WELL · 42-003-00608 · DISTRICT 8
Lockhart & Brown #1
Andrews County · Martin (McKee) field · Vertical
Lockhart & Brown #1 (API 42-003-00608) is a plugged well in Andrews County, plugged September 6, 2002, last operated by Maralo LLC.
The RRC has issued 2 drilling permits between 1988 and 2000, permitted to 8,935 ft.
Completion filings report 2 formation tops, including San Andres, McKee.
Its 2 leases have reported 12.6K barrels of oil and 15.2K mcf of gas since January 1993, last reporting in March 2008. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Midland, TX · P-5 Y, filed Sep 9, 2005 · 23 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Maralo LLC |
| Production reports | Maralo, LLCthrough Aug 2002 |
| Latest permit | Maralo, LLCJun 28, 2000 |
- 8,935
- total depth, ft
- 2
- permits on file
- Jun 28, 2000
- last permit issued
- Sep 25, 1988
- completed
- 12.6K
- cumulative oil, bbl
- 15.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 25, 1988
- Shut in
- —
- Plugged
- Sep 6, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lockhart & Brown O-10-25890 | Martin (McKee) | Maralo, LLC | 1 | 11.1K | 13.3K | Jan 1993 – Mar 2008 |
| Lockhart & Brown O-10-36360 | Goldsmith, N. (San Andres, Con.) | Maralo, LLC | 1 | 1.53K | 1.94K | Jul 2000 – Nov 2002 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Maralo, Inc.Jan 1993 → Nov 1997
- 2Maralo, LLCJun 2000 → Aug 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 496583-99 | Recompletion | Maralo, LLC | Jun 27, 2000 | Jun 28, 2000 | May 30, 2000 | 5,500 |
| 350727-99 | Recompletion | Maralo, Inc. | Aug 31, 1988 | Sep 2, 1988 | — | 8,935 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-25890 | — | — | — | — |
| — | — O-10-36360 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,275 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Andres | 4,500 | -1,225 |
| McKee | 8,200 | -4,925 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,320 | 4,439 | Perforated |
| 8,213 | 8,305 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 296 | — | — |
| 7.625 | 4,016 | — | — |
| 5.5 | 8,859 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 25, 2000 | Jul 27, 2000 | Yes |
| 00 | Aug 15, 2000 | Oct 3, 1988 | Yes |
| 00 | Oct 20, 1988 | Oct 3, 1988 | Yes |
| 00 | Oct 15, 1988 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-003-00608 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-003-00608 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.