WELL · 42-003-01303 · DISTRICT 8

University -E- #4

N

Andrews County  · Vertical

University -E- #4 (API 42-003-01303) is a former disposal or injection well in Andrews County, last operated by Sun Expl. & Prod. CO.-Midland; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued November 27, 1985, permitted to 12,570 ft.

Operator of record

Sun Expl. & Prod. Co.-Midland

Midland, TX · P-5 Y, filed Oct 29, 1997 · 815 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitSun Expl. & Prod. Co.-MidlandNov 27, 1985
12,570
total depth, ft
1
permits on file
Nov 27, 1985
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
291289-99RecompletionSun Expl. & Prod. Co.-MidlandNov 27, 1985Nov 27, 1985—12,570

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

326K
bbl, last 12 reported months
1.62M
bbl, all reported
Jun 1985
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000015761UIC PermitPlugged Apr 23, 1986000–0

MONTHLY INJECTED, BBL · H-10 · LAST 16 REPORTED MONTHS

Last 12 months 836,190

050K100K150K19841985

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00301303, documented in the API reference.