WELL · 42-003-01760 · DISTRICT 8
State BM #2
Andrews County · Vertical
State BM #2 (API 42-003-01760) is a permitted well in Andrews County filed by Americo Energy Resources, LLC; no completion report is on file yet.
The RRC has issued 4 drilling permits between 1982 and 2011, permitted to 13,000 ft.
Completion filings report 5 formation tops, including Pennsylvanian, Strawn, Devonian, Silurian (undifferentiated).
Operator of record
Houston, TX · P-5 Y, filed Oct 4, 2025 · 80 permits on file · (713) 984-9700
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Americo Energy Resources, LLCSep 15, 2011 |
- 13,000
- total depth, ft
- 4
- permits on file
- Sep 15, 2011
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| State-Silurian-Cons. No. 2 O-10-31216 | Emma (Ellenburger) | Pennzoil Exploration & Prod. Co. | 1 | 0 | 0 | Jan 1993 – Feb 1995 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 724110-99 | Reenter | Americo Energy Resources, LLC | Sep 13, 2011 | Sep 15, 2011 | — | 13,000 |
| 384196-99 | Recompletion | Chevron U. S. A. Inc. | Feb 4, 1991 | Feb 6, 1991 | — | 12,597 |
| 327421-99 | Recompletion | Chevron U. S. A. Inc. | Mar 6, 1987 | Mar 10, 1987 | — | 12,597 |
| 150459-99 | Recompletion | Gulf Oil Corp. | Feb 11, 1982 | Feb 11, 1982 | — | 12,590 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-31216 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,190 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| PennsylvanianUPPER PENN | 8,832 | -5,642 |
| Strawn | 9,139 | -5,949 |
| Devonian | 10,396 | -7,206 |
| Silurian (undifferentiated)SILURIAN | 11,490 | -8,300 |
| Ellenburger | 12,376 | -9,186 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,833 | 9,078 | Perforated |
| 12,363 | 12,368 | Perforated |
| — | 12,375 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 357 | 17.5 | 400 S |
| 13.375 | 357 | — | 400 S |
| 9.625 | 4,145 | 12.75 | 3,500 S |
| 9.625 | 4,145 | — | 3,500 S |
| 2.375 | 8,724 | — | — |
| 7 | 12,464 | 8.75 | 1,080 S |
| 7 | 12,464 | — | 1,080 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 28, 1990 | Aug 2, 1990 | — |
| 00 | May 28, 1987 | May 12, 1987 | Yes |
| 00 | May 21, 1987 | — | — |
| 00 | Jan 12, 1984 | Jul 18, 1983 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-003-01760 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-003-01760 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00301760, documented in the API reference.