WELL · 42-003-31763 · DISTRICT 8
Andrews Brine Station #BP #1
Andrews County · Andrews (Wolfcamp-Penn.) field · Vertical
Andrews Brine Station #BP #1 (API 42-003-31763) is a plugged well in Andrews County, plugged November 26, 2007, last operated by Nabors Well Services Ltd..
The RRC has issued one drilling permit, issued September 28, 1978, permitted to 2,900 ft.
It was permitted by Trey Rentals, Inc. and has since transferred to Nabors Well Services Ltd. on the wellbore schedule.
Operator of record
Permitted by Trey Rentals, Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Sep 7, 2012 · 5 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Nabors Well Services Ltd. |
| Production reports | none |
| Latest permit | Trey Rentals, Inc.Sep 28, 1978 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,900
- total depth, ft
- 1
- permits on file
- Sep 28, 1978
- last permit issued
- Dec 17, 1978
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 17, 1978
- Shut in
- —
- Plugged
- Nov 26, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Andrews Brine Station O-10-34669 | Andrews (Wolfcamp-Penn.) | Nabors Well Services Ltd. | 1 | 0 | 0 | Oct 1995 – Mar 2008 |
| Andrews Station O-10-30370 | Andrews (Pennsylvanian) | Trey Trucks Div R&H Well Service | 1 | 0 | 0 | Jan 1993 – Oct 1995 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 33688-99 | Drill | Trey Rentals, Inc. | Sep 28, 1978 | Sep 28, 1978 | Dec 15, 1978 | 2,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-30370 | — | — | — | — |
| — | — O-10-34669 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,983 | 2,800 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 250 | 12.25 | 175 S |
| 5.5 | 1,983 | 7.875 | 450 S |
| 2.875 | 2,770 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 25, 1995 | Dec 30, 1985 | — |
| 00 | Jan 16, 1986 | Dec 30, 1985 | — |
| 00 | Jan 11, 1986 | — | — |
| 00 | Jan 12, 1984 | Mar 19, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-003-31763 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-003-31763 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000091584 | UIC Permit | Plugged Jan 24, 2008 | 300 | 900 | 1,983–2,800 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00331763, documented in the API reference.