WELL · 42-003-33416 · DISTRICT 8
Tullamore 24 #1
Andrews County · Vertical
Tullamore 24 #1 (API 42-003-33416) is a plugged well in Andrews County, plugged February 13, 1983, last operated by Limestone Exploration II, LLC.
The RRC has issued 2 drilling permits between 1982 and 2013, permitted to 7,900 ft.
Completion filings report 6 formation tops, including Yates, San Andres, Tubb, Clear Fork.
Its lease has reported 139K barrels of oil and 209K mcf of gas since October 2013, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Midland, TX · P-5 Y, filed Oct 4, 2019 · 23 permits on file · (432) 770-2325
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Texland Petroleum, L.P.through Apr 2026 |
| Latest permit | Limestone Exploration II, LLCMar 18, 2013 |
- 7,900
- total depth, ft
- 2
- permits on file
- Mar 18, 2013
- last permit issued
- —
- completed
- 139K
- cumulative oil, bbl
- 209K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Feb 13, 1983
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Tullamore 24 O-10-45335 | Boydell, S. (Clear Fork, Lo.) | Texland Petroleum, L.P. | 2 | 139K | 209K | Oct 2013 – Jul 2026 |
Oil, barrels lease total
Last 12 months 5,704 · prior 12 5,822(-2%)
Gas, mcf lease total
Last 12 months 7,982 · prior 12 8,536(-6%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Limestone Exploration II, LLCNov 2013 → Oct 2018
- 2Texland Petroleum, L.P.Nov 2018 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 758752-99 | Reenter | Limestone Exploration II, LLC | Mar 15, 2013 | Mar 18, 2013 | Sep 24, 2013 | 7,900 |
| 181587-99 | Drill | Brazos Petroleum Co. | Dec 29, 1982 | Dec 29, 1982 | — | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-45335 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,388 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yates | 2,885 | 503 |
| San Andres | 4,352 | -964 |
| Tubb | 6,655 | -3,267 |
| Clear ForkLOWER CLEARFORK | 6,950 | -3,562 |
| Clear ForkLOWER CLEARFORK | 6,956 | -3,568 |
| Witchita/A;bany | 7,258 | -3,870 |
| Wichita-AlbanyWICHITA ALBANY | 7,259 | -3,871 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,974 | 7,078 | Perforated |
| 7,405 | 7,507 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 5.5 | 7,646 | 7.875 | 815 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 15, 2015 | Sep 30, 2015 | Yes |
| 00 | Dec 10, 2014 | Nov 20, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-003-33416 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-003-33416 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00333416, documented in the API reference.