WELL · 42-003-37671 · DISTRICT 8
Parker Ranch '1' #1
Andrews County · Vertical
Parker Ranch '1' #1 (API 42-003-37671) is a permitted well in Andrews County filed by Fossil Rock Resources, Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1995 and 2005, permitted to 8,500 ft.
Completion filings report 2 formation tops, including Yates, Wichita-Albany.
Its lease has reported 41K barrels of oil and 180K mcf of gas since August 1995, last reporting in July 2026.
Operator of record
Fort Worth, TX · P-5 Y, filed Sep 11, 2015 · 13 permits on file · (817) 737-1235
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Vin Fisher Operating, Inc.through Oct 2024 |
| Latest permit | Fossil Rock Resources, Inc.Jun 23, 2005 |
- 8,500
- total depth, ft
- 2
- permits on file
- Jun 23, 2005
- last permit issued
- —
- completed
- 41K
- cumulative oil, bbl
- 180K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1995 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Parker Ranch "1" O-10-34662 | Three Bar (Devonian) | Vin Fisher Operating, Inc. | 1 | 41K | 180K | Aug 1995 – Jul 2026 |
Oil, barrels lease total
Last 12 months 0 · prior 12 377(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rust Oil Corp.Nov 1995 → Sep 1999
- 2Rust Operating Co., Inc.Oct 1999 → Feb 2000
- 3Fossil Rock Resources, Inc.Mar 2000 → May 2016
- 4Vin Fisher Production, Inc.Jul 2016 → Oct 2017
- 5Mercury Operating, LLCDec 2017 → Apr 2019
- 6Vin Fisher Operating, Inc.May 2019 → Oct 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 602125-99 | Recompletion | Fossil Rock Resources, Inc. | Jun 15, 2005 | Jun 23, 2005 | — | 8,300 |
| 436719-99 | Drill | Rust Oil Corp. | Jun 9, 1995 | Jun 9, 1995 | Jun 28, 1995 | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-34662 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,337 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yates | 2,848 | 489 |
| Wichita-AlbanyWICHITA ALBANY | 6,897 | -3,560 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,048 | 8,096 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 352 | 17 | 350 S |
| 8.625 | 3,945 | 12.25 | 1,270 S |
| 5.5 | 8,300 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 17, 1995 | Aug 28, 1995 | Yes |
| 00 | Oct 19, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-003-37671 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-003-37671 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00337671, documented in the API reference.