WELL · 42-003-42160 · DISTRICT 8

Mabee 240 #4001

Y

Andrews County · Mabee Nova (Fusselman) field · Injection  · Vertical

Mabee 240 #4001 (API 42-003-42160) is a well in Andrews County operated by Cog Operating LLC, completed July 25, 2020 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued October 19, 2010, permitted to 14,000 ft.

It was permitted by Reliance Energy, Inc. and has since transferred to Cog Operating LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Atoka, B Woodford, Woodford, Fusselman.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 110K barrels injected in the 12 months reported through February 2026.

Operator of record

COG Operating LLC

Permitted by Reliance Energy, Inc.; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed May 4, 2026 · 4,568 permits on file · (432) 853-2355

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCOG Operating LLC
Production reportsnone
Latest permitReliance Energy, Inc.Oct 19, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
2
permits on file
Oct 19, 2010
last permit issued
Jul 25, 2020
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 25, 2020
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mabee 240 O-10-39833Mabee Nova (Fusselman)COG Operating LLC300Sep 2008 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
703802-98DrillReliance Energy, Inc.Jan 3, 2011Oct 19, 2010Nov 11, 201014,000
703802-99DrillReliance Energy, Inc.Oct 14, 2010Oct 19, 2010Nov 11, 201013,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-39833————

Formation tops

As filed on W-2/G-1. Subsea from 2,943 ft elevation.Download CSV →

FormationMD ftSubsea
Atoka11,029-8,086
B Woodford12,276-9,333
Woodford12,276-9,333
Fusselman12,984-10,041

Perforations

Perforated and open-hole intervals.

FromToType
13,05513,104Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37538217.5375 S
8.6255,21211800 S
5.511,8927.8751,150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 29, 2021Oct 28, 2021—
00Aug 19, 2020Aug 6, 2020—
00Aug 18, 2020Aug 6, 2020—
00Nov 10, 2016Sep 14, 2016—
00Sep 8, 2016——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

110K
bbl, last 12 reported months
8.3M
bbl, all reported
Feb 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000102741H-1 InjectionActive20,0003,00011,200–13,280

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 109,871 · prior 12 493,367(-78%)

050K100K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00342160, documented in the API reference.