WELL · 42-005-30231 · DISTRICT 6
Johnson #1
Angelina County · Wildcat field · Horizontal
Johnson #1 (API 42-005-30231) is a plugged horizontal well in Angelina County, plugged December 18, 2015, last operated by Range Production Company LLC.
The RRC has issued 2 drilling permits (amended once) between 1990 and 1992, permitted to 21,000 ft.
It was permitted by Kraft Petroleum Corporation and has since transferred to Range Production Company LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Navarro, Austin Chalk, James Lime, Smackover.
Operator of record
Permitted by Kraft Petroleum Corporation; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Apr 5, 2019 · 10 permits on file · (817) 980-4254
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Range Production Company LLC |
| Production reports | none |
| Latest permit | Kraft Petroleum CorporationDec 18, 1992 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 21,000
- total depth, ft
- 3
- permits on file
- Dec 18, 1992
- last permit issued
- Aug 3, 1995
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1995 THROUGH Dec 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 3, 1995
- Shut in
- —
- Plugged
- Dec 18, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Johnson G-6-165914 | Wildcat | Range Production Company, LLC | 1 | 0 | 0 | Dec 1995 – Dec 2015 |
| — O-6-13063 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 407435-98 | Reenter | Kraft Petroleum Corporation | Sep 29, 1994 | Dec 18, 1992 | Jun 7, 1995 | 17,500 |
| 407435-99 | Reenter | Saratoga Resources, Inc. | Dec 18, 1992 | Dec 18, 1992 | — | 9,500 |
| 371494-99 | Drill | Mobil Producing TX. & N.M. Inc. | Mar 27, 1990 | Mar 28, 1990 | Apr 30, 1990 | 21,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-165914 | — | — | — | — |
| — | — O-6-13063 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 261 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Navarro | 7,242 | -6,981 |
| Austin Chalk | 8,280 | -8,019 |
| James LimeJAMES | 11,490 | -11,229 |
| James LimeJAMES LIMESTONE | 11,490 | -11,229 |
| Smackover | 17,640 | -17,379 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 16,358 | 16,384 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 125 | 28 | 270 S |
| 13.375 | 3,528 | 16 | 2,725 S |
| 9.625 | 15,182 | 12.25 | 3,200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 22, 1998 | Nov 17, 1997 | Yes |
| 00 | Jan 14, 1998 | — | — |
| 00 | Sep 22, 1992 | Apr 1, 1991 | Yes |
| 00 | Sep 4, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-005-30231 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-005-30231 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.