WELL · 42-005-30304 · DISTRICT 6

Angelina Lumber Company #3

Plugged

Angelina County · Rocky Springs (U.G.R.) field  · Vertical

Angelina Lumber Company #3 (API 42-005-30304) is a plugged well in Angelina County, plugged October 23, 2012, last operated by Palmer Petroleum Inc..

The RRC has issued 4 drilling permits (amended once) between 2007 and 2010, permitted to 12,000 ft.

Completion filings report 4 formation tops, including Glen Rose, Rodessa, Pettit, Travis Peak.

Its 4 leases have reported 451 barrels of oil and 36.5K mcf of gas since May 2007, last reporting in January 2013. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Palmer Petroleum Inc.

Shreveport, LA · P-5 Y, filed Jun 4, 2025 · 304 permits on file · (318) 222-0517

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePalmer Petroleum Inc.
Production reportsPalmer Petroleum Inc.through May 2012
Latest permitPalmer Petroleum Inc.Aug 17, 2010
12,000
total depth, ft
5
permits on file
Aug 17, 2010
last permit issued
Jul 2, 2010
completed
451
cumulative oil, bbl
36.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2007 THROUGH Jan 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 2, 2010
Shut in
—
Plugged
Oct 23, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Angelina Lumber Company O-6-14992Rocky Springs (U.G.R.)Palmer Petroleum Inc.1451224Jul 2010 – Jan 2013
Angelina Lumber Company G-6-247601Redland, NE (Travis Peak)Palmer Petroleum Inc.1022.8KFeb 2008 – Mar 2011
Angelina Lumber Co. G-6-233167Red Land, NE (Pettit)Palmer Petroleum Inc.1013.5KJul 2007 – Feb 2008
Angelina Lumber Co. G-6-231080Redland, NE (Travis Peak)Palmer Petroleum Inc.100May 2007 – Jul 2007

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Palmer Petroleum Inc.Jul 2007 → Jan 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
697427-99RecompletionPalmer Petroleum Inc.Jun 10, 2010Aug 17, 2010May 11, 201011,000
654958-98RecompletionPalmer Petroleum Inc.Jul 1, 2008Jun 12, 2008Feb 18, 200811,500
654958-99RecompletionPalmer Petroleum Inc.Feb 8, 2008Jun 12, 2008—11,500
650799-99RecompletionPalmer Petroleum Inc.Dec 5, 2007Dec 12, 2007Jul 15, 200710,600
636736-99DrillPalmer Petroleum Inc.Apr 9, 2007Apr 16, 2007Apr 24, 200712,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-231080————
—— G-6-233167————
—— G-6-247601————
—— O-6-14992————

Formation tops

As filed on W-2/G-1. Subsea from 226 ft elevation.Download CSV →

FormationMD ftSubsea
Glen Rose7,256-7,030
Rodessa8,448-8,222
Pettit9,580-9,354
Travis Peak10,460-10,234

Perforations

Perforated and open-hole intervals.

FromToType
8,2768,285Perforated
10,39410,415Perforated
10,55210,794Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6253,89512.251,460 S
5.511,5757.875950 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 17, 2011Aug 24, 2010Yes
00Jan 3, 2011——
00Dec 28, 2009Mar 6, 2008Yes
00Jun 4, 2009——
00Mar 4, 2008Nov 13, 2007Yes
00Feb 21, 2008——
00Dec 11, 2007Oct 26, 2007Yes
00Dec 3, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00530304, documented in the API reference.