WELL · 42-005-30307 · DISTRICT 6
Anderson Stanley GU 1 #1
Angelina County · Red Land North (Travis Peak) field · Directional
Anderson Stanley GU 1 #1 (API 42-005-30307) is a plugged well in Angelina County, plugged May 3, 2013, last operated by Samson Lone Star LLC.
The RRC has issued one drilling permit, issued May 16, 2007, permitted to 13,000 ft.
It was permitted by Samson Lone Star LP and has since transferred to Samson Lone Star LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Rodessa, Bexar, James Lime, Pettit.
Operator of record
Permitted by Samson Lone Star LP; the EWA schedule now lists a different operator.
Tulsa, OK · P-5 Y, filed Oct 4, 2025 · 1,290 permits on file · (866) 817-1500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Samson Lone Star LLC |
| Production reports | Samson Lone Star, LLCthrough Apr 2010 |
| Latest permit | Samson Lone Star LPMay 16, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,000
- total depth, ft
- 1
- permits on file
- May 16, 2007
- last permit issued
- Aug 9, 2007
- completed
- 0
- cumulative oil, bbl
- 98K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2007 THROUGH May 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 9, 2007
- Shut in
- —
- Plugged
- May 3, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Anderson, Stanley GU 1 G-6-231204 | Red Land,north (Travis Peak) | Samson Lone Star, LLC | 1 | 0 | 98K | Aug 2007 – May 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Samson Lone Star, LLCAug 2007 → Apr 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 638504-99 | Drill | Samson Lone Star LP | May 7, 2007 | May 16, 2007 | Jun 4, 2007 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-231204 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 350 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rodessa | 8,207 | -7,857 |
| Bexar | 9,710 | -9,360 |
| James LimeJAMES | 9,828 | -9,478 |
| Pettit | 10,105 | -9,755 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,845 | 11,174 | Perforated |
| 11,404 | 11,413 | Perforated |
| 11,634 | 11,834 | Perforated |
| 11,983 | 12,353 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,807 | 12.25 | 1,850 S |
| 4.5 | 12,470 | 8.75 | 1,380 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 8, 2008 | Oct 8, 2007 | — |
| 00 | Dec 21, 2007 | Sep 21, 2007 | Yes |
| 00 | Dec 6, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-005-30307 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-005-30307 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00530307, documented in the API reference.