WELL · 42-007-00300 · DISTRICT 4
Fulton Beach /C Sand/ Unit #1
Aransas County · Fulton Beach (C-1-2-3 Sand) field · Vertical
Fulton Beach /C Sand/ Unit #1 (API 42-007-00300) is a plugged well in Aransas County, plugged October 17, 2008, last operated by Omega Energy LLC.
The RRC has issued 2 drilling permits in 1984, permitted to 8,330 ft.
It was permitted by Hunt, WM. Herbert, Trust Est. and has since transferred to Omega Energy LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.
Operator of record
Permitted by Hunt, Wm. Herbert, Trust Est.; the EWA schedule now lists a different operator.
Corpus Christ, TX · P-5 Y, filed Mar 4, 2026 · (361) 816-8910
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Omega Energy LLC |
| Production reports | none |
| Latest permit | Hunt, Wm. Herbert, Trust Est.Dec 13, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,330
- total depth, ft
- 2
- permits on file
- Dec 13, 1984
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Oct 17, 2008
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Spencer-Kent-Crane G-4-114515 | Fulton Beach (B-2) | Omega Energy Corp. | 1 | 0 | 0 | Jan 1993 – Oct 2008 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 261106-99 | Recompletion | Hunt, Wm. Herbert, Trust Est. | Dec 10, 1984 | Dec 13, 1984 | — | 8,330 |
| 243691-99 | Recompletion | Hunt, Wm. Herbert, Trust Est. | Jun 27, 1984 | Jun 28, 1984 | — | 8,330 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-114515 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 15 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 5,370 | -5,355 |
| Frio | 6,800 | -6,785 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,883 | 6,893 | Perforated |
| 6,976 | 6,985 | Perforated |
| 7,014 | 7,018 | Perforated |
| 7,030 | 7,036 | Perforated |
| — | 7,126 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,015 | 15 | 650 sx |
| 7 | 7,600 | 9.875 | 800 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 12, 1985 | Jan 14, 1985 | — |
| 00 | Mar 1, 1985 | Jan 7, 1985 | — |
| 00 | Aug 20, 1984 | Jun 29, 1984 | — |
| 00 | Jul 20, 1984 | Jun 29, 1984 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-007-00300 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-007-00300 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00700300, documented in the API reference.