WELL · 42-007-30596 · DISTRICT 4
Nine Mile Point #10
Aransas County · Vertical
Nine Mile Point #10 (API 42-007-30596) is a permitted well in Aransas County filed by Eog Resources, Inc.; no completion report is on file yet.
The RRC has issued 4 drilling permits between 1978 and 2008, permitted to 12,000 ft.
Operator of record
Midland, TX · P-5 Y, filed Jul 4, 2026 · 16,348 permits on file · (713) 594-5431
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Lamar Oil & Gas, Inc.through May 2025 |
| Latest permit | EOG Resources, Inc.Apr 7, 2008 |
- 12,000
- total depth, ft
- 4
- permits on file
- Apr 7, 2008
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 1.71M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nine Mile Point Consolidated GU G-4-82781 | Nine Mile Point (Consol. Fld.) | Lamar Oil & Gas, Inc. | 1 | 0 | 1.71M | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 1 · prior 12 1(+0%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Mar 2000
- 2Exxon Mobil CorporationJul 2000 → Jul 2000
- 3EOG Resources, Inc.Apr 2006 → Jan 2011
- 4Goldking Onshore Operating, LLCFeb 2011 → Dec 2014
- 5Lamar Oil & Gas, Inc.Nov 2015 → May 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 658022-99 | Recompletion | EOG Resources, Inc. | Mar 24, 2008 | Apr 7, 2008 | Feb 24, 2008 | 12,000 |
| 36900-99 | Drill | Exxon Corp. | Nov 13, 1978 | Nov 13, 1978 | Mar 11, 1979 | 12,000 |
| 32149-99 | Drill | Exxon Corp. | Sep 8, 1978 | Sep 8, 1978 | Mar 11, 1979 | 12,000 |
| 29126-99 | Drill | Exxon Corp. | Jul 17, 1978 | Jul 17, 1978 | Mar 11, 1979 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-82781 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,220 | 10,238 | Perforated |
| 10,266 | 10,286 | Perforated |
| 10,434 | 10,454 | Perforated |
| 10,680 | 10,700 | Perforated |
| 10,680 | 11,490 | Perforated |
| 10,826 | 10,846 | Perforated |
| 10,888 | 10,908 | Perforated |
| 10,926 | 10,946 | Perforated |
| 10,950 | 10,970 | Perforated |
| 11,026 | 11,046 | Perforated |
| 11,280 | 11,300 | Perforated |
| 11,452 | 11,490 | Perforated |
| 11,658 | 11,668 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,065 | 14.75 | 950 S |
| 7.625 | 9,245 | 9.875 | 385 S |
| 7.625 | 9,246 | 9.875 | 385 S |
| 5 | 11,629 | 6.75 | 900 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 16, 2009 | Jul 25, 2008 | — |
| 00 | May 5, 1995 | Apr 12, 1995 | — |
| 00 | Nov 10, 1993 | Sep 9, 1993 | — |
| 00 | Jan 12, 1984 | Jul 3, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-007-30596 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-007-30596 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/00730596, documented in the API reference.